Lably
Skip to content

1996 Pos Dipang mudslide

1996 mudslide disaster in Malaysia

  • 3 min read
  • 3 chapters

Related on Lably

Through Rain, Soil erosion and Logging

Background

The village comprised approximately 60 houses, constructed with assistance from the Department of Orang Asli Development (JHEOA) and housing around 1,500 residents. It was established in 1978 following successful cultivation of an orchard by the local community. Prior to this, residents had lived at Batu 19, Cameron Highlands Road, located nearby.

Incident

Due to heavy rainfall starting at noon and lasting for six hours, most residents of Pos Dipang remained indoors. Around 6:00 PM, a loud noise was heard from the hills behind the village, followed shortly by a torrent of mud and water that breached the village, causing widespread flooding and structural damage. The force of the mudslide displaced several homes along the banks of the Dipang River and swept away some residents attempting to evacuate. The mudslide also destroyed bridges and cut off certain roads in the area.

Rescue operations began with 400 personnel, including local police, fire brigades, the Royal Ranger Regiment’s 2nd Brigade, the 69th Commando of the General Operations Force (GOF) Ulu Kinta, the 3rd Battalion of the GOF Bidor, and additional support from the Kampar District Office staff and Civil Defense Forces from Ipoh. The first body, an Orang Asli woman in her 30s, was found at 1:30 AM. Despite difficult conditions, including swift currents and darkness due to power outages, rescue teams continued their search.

After 13 days, the search was officially called off on September 11, 1996, with the final death toll at 39, with five missing.

Aftermath

Following the mudslide disaster at the Pos Dipang Orang Asli settlement on August 29, 1996, Menteri Besar of Perak Ramli Ngah Talib announced on September 1 that an official investigation report would soon be released. The investigation team included notable figures such as Dr. Mazlan Ahmad, Director-General of the Division of Space Science Studies (BAKSA) from the Prime Minister's Department, and Professor Ibrahim Keno, a geologist from Universiti Kebangsaan Malaysia.

In response to the tragedy, nearly all state governments with significant Orang Asli populations directed the Department of Orang Asli Development (JHEOA) to identify vulnerable settlements, particularly those prone to mudslides. Consequently, a new settlement was established for the Pos Dipang Orang Asli community near their original location. This new 1.5-hectare settlement, regarded as a model for future resettlement projects, was found by a state government research to be suitable and safe for habitation. It consists of 53 houses, each constructed at a cost of RM7,000.

Additionally, Information Minister Mohamed Rahmat, acting as Chairman of the National Disaster Committee, allocated RM100,000 from the National Disaster Fund to support the affected families and assist recovery efforts.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Post-classical