Lably
Skip to content

Aguçadoura test site

  • 3 min read
  • 4 chapters

Related on Lably

Through Portugal and Renewable energy

It was established in 2001, and as of 2024 four developers have tested devices there: the Archimedes Wave Swing, three Pelamis Wave Power P1 machines as the Aguçadoura Wave Farm, the Principle Power WindFloat, and CorPower Ocean's C4.

Since 2021, it has been managed by WavEC and OceanACT.

Archimedes Wave Swing

In May 2004, a 2 MW (peak power output) Archimedes Wave Swing (AWS) was installed at Aguçadoura, after unsuccessful attempts in 2001 and 2002. The installation took three and a half days, and was eventually achieved by attaching the convertor to a pontoon and then submerging it and attaching to the seabed while the chamber remained floating.

The AWS device on the submersible pontoon foundation was 48 m long, 28 m wide and 35 m high, and sat on the sea bed beneath the waves. It had a 9.5 m diameter moving captor with a stroke of 7 m that moved with the waves at a maximum speed of 2.2 m/s. It was connected to the Portuguese grid by a 6 km long cable.

The testing was postponed until mid-September 2004, due to technical issues communicating with the device. At the end of October 2004 the testing license expired and the tests finished. The AWS intellectual property was later transferred to a Scottish company AWS Ocean Energy Ltd.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy