The project is being co-developed by Airtricity and GE Wind Energy. The Arklow Bank Wind Farm capacity remained 25MW as of October 2018. In October 2022, lightning struck and burned a turbine.

Phase 1

In 2002, Airtricity obtained an offshore lease for a 520 MW offshore wind farm. The first phase of the project, commissioned in June 2004, consists of seven GE 3.6-megawatt generators. They were installed by the Danish offshore wind farms services provider A2SEA. Power cables were laid by Five Oceans Services (now SIEM Offshore Contractors), and construction of the turbines themselves was based out of Rosslare port. All of the turbines have a height of 73.5 metres (241 ft) and height to top of blade of 124 metres (407 ft). The blade length is 50.5 metres (166 ft) and each turbine has three blades. Each turbine weights 290 tonnes. They use steel monopole foundations driven in by a hydraulic hammer and each turbine has a landing platform for boat access. They are spaced 600 metres (2,000 ft) apart. Generated electricity is fed to ESB Networks distribution grid through the Arklow National Grid Substation.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Energy