Australia-Asia Power Link

  • 5 min read
  • 2 chapters

Related on Lably

Through Watt and Administration (law)

Initial plans forecast that a new solar farm in the Northern Territory of Australia would produce up to 20 gigawatts of electricity, most of which would be exported to Singapore, and at a later point Indonesia, by a 4,300 km (2,700 mi) 3 GW HVDC transmission line. A large battery would store energy in order to level energy availability as sunlight varies throughout the day. AAPowerLink has been developed by an Australian company Sun Cable, initially backed by Andrew Forrest and Mike Cannon-Brookes. It was projected to begin construction in mid-2023, with operation starting in early 2026 and completion by late 2027, and estimated to add A$8 billion to the economy of the Northern Territory.

The project collapsed in January 2023, after Sun Cable was placed into voluntary administration following a disagreement between Forrest and Cannon-Brookes about the need to put more funding into the venture. In May 2023, a consortium led by Cannon-Brookes' Grok Ventures won the bid to acquire Sun Cable, with the takeover finalised on 7 September 2023. The revised plans involve supplying electricity to Darwin by 2030, and to Singapore a few years thereafter. Eventually the solar farm would produce 6 gigawatts of power.

Design

The AAPowerLink begins with the development of the world's biggest integrated renewable energy zone, (which includes solar PV generation, energy storage and voltage source converter) on Powell Creek in the Barkly Region of the Northern Territory, using photovoltaic modules designed by Australian company 5B and prefabricated at a proposed factory in Darwin. The solar panels will cover 12,000 ha (30,000 acres) (12 km x 10 km) in an area with some of the best solar resources in the world. An 800 km (500 mi) overhead power line will transmit 6.4 GW to Darwin, where it will deliver up to 4GW to a proposed Middle Arm Sustainable Development Precinct before transferring to a 4,300 km (2,700 mi) 1.75 GW undersea power line to Singapore. This undersea cable will be the longest undersea cable in the world, exceeding the existing longest undersea power cable by a factor of around five.

Batteries at the solar array in Darwin and Singapore will provide load-balancing for continuous daily dispatch.

As of 2023, Singapore produces over 94% of its electricity from natural gas, but seeks to reduce its greenhouse gas emissions and diversify its energy imports. The AAPowerLink could provide about 15% of Singapore's electricity, reducing Singapore's emissions by up to 6 million tonnes per year.

In September 2021, it was announced that there would be further expansions to the proposed size of the project, from 10 GW to 20 GW capacity, and from 20 GWh to 36-42 GWh of battery storage, with a new estimated construction cost of $30 billion. Forecasts suggest up to $A2 billion in exports, 1750 jobs in construction, 350 operational jobs, and 12,000 indirect jobs will be created across Australia, Singapore and Indonesia over its 70 year operational life.