Lably
Skip to content

B28 trainset

Upcoming Indian high speed train type

  • 7 min read
  • 7 chapters

Related on Lably

Through Bengaluru

Background

The Mumbai–Ahmedabad high-speed rail corridor was planned to use Japanese E5 Series Shinkansen trainsets, but negotiations were terminated in 2024 over cost and modification disputes for Indian conditions. Thereafter, the Integral Coach Factory (ICF) tendered for indigenous prototypes. BEML was the sole bidder and was awarded the contract at a lower per-coach cost. Primary rolling stock for the corridor was originally intended to be the Japanese E10 Series Shinkansen, while the B28 prototypes were intended for trials and development work., though later the railway ministry decided on using the B28 from initial operations onward as well.

Formation

According to BEML procurement technical specifications, the Train B28 trainset is configured as an 8-car rake consisting of two 4-car basic units with distributed traction. The standard formation layout is structured as follows:

Sign in to keep reading

6 more chapters are free with a Lably account.

More in India