Baglihar Dam

Dam on the Chenab river in India

  • 3 min read
  • 2 chapters

Related on Lably

Through India, Pakistan and World Bank Group

The first power project executed by the Jammu and Kashmir Power Development Corporation, it was conceived in 1992 and approved in 1996, with construction begun in 1999. The project was estimated to cost US$1 billion. The project consists of two-stage of 450MW each. The first stage of the project was completed in 2008-09 and the second stage of the project was completed in 2015–16.

Desilting the Dam

Baglihar Dam is fully operational.

When Salal Dam was constructed on Chenab River in 1980s after Pakistan had finally agreed in 1978 to allow the construction, the six under-sluices that were provided during the construction had to be plugged permanently before the dam could be operated because Pakistan had vetoed on desilting the dam claiming that it violated the Indus Water Treaty. However, no such prohibition was agreed by India for Baglihar dam that was constructed twenty years later. Chenab river carries high quantity of silt. Its annual silt load is estimated to be 32,000,000 m3 (26,000 acre⋅ft). The silt accumulation elevates the river bed, reduces the reserviour capacity, reduces power generation and damages turbines.

Regular drawdown flushing (de-silting) is being done in Baglihar dam. After the Indus Water Treaty was suspended in April 2025, India does not inform Pakistan when the desilting operation is done.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Energy