Bangweulu Solar Power Station
Solar farm in Zambia
- 2 min read
- 4 chapters
Related on Lably
Through World Bank Group and India
Location
The power plant is located in the Lusaka South Multi-Facility Economic Zone, in Kafue District, in Lusaka Province, approximately 25 kilometres (16 mi), by road, southeast of the central business district of Lusaka, the capital of Zambia and the largest city in that country. BSPS its on 52 hectares (130 acres) of real estate. The geographical coordinates of Bangweulu Solar Power Station are 15°30'42.0"S, 28°25'54.0"E (Latitude:-15.511667; Longitude:28.431667), just north of the Ngonye Solar Power Station.
Sign in to keep reading
3 more chapters are free with a Lably account.
Overview
The Government of Zambia, through IDC Zambia, working with the World Bank Group, as part of the bank's program "Scaling Solar", awarded the tender to develop this power station to Neoen, a French independent power producer. The American solar panel manufacturer First Solar Inc. was selected to manufacture and supply the solar panels for the power station.
The power generated here is purchased by Zambia Electricity Supply Corporation Limited (ZESCO) under a 25-year power purchase agreement executed between ZESCO and Neoen at US$0.0602 per kWh.
Ownership
This power station is owned by a consortium whose members are illustrated in the table below. The members of the consortium formed a special purpose vehicle company Bangweulu Power Company Limited, which operates and maintains the power station.
Funding, construction and timeline
This renewable energy infrastructure development project received a grant of US$2 million, from the United States Agency for International Development (USAID).
The International Finance Corporation (IFC), and the Overseas Private Investment Corporation (formerly OPIC, now DFC), jointly lent US$39 million to the consortium of owner/developers of BSPS.
The EPC contract was awarded to Sterling & Wilson, an engineering and Construction company, based in India. Construction started in December 2017, with commercial commissioning taking place in March 2019.