Construction on the power station, with an original capacity of 2,100 megawatts (2,800,000 hp), began in March 1977 and was completed in December 1985 at a cost of $1.6 billion, Voith-Siemens upgraded the six turbines between 2004 and 2009, increasing power generation to 500.5 MW and pumping power to 480 megawatts (640,000 hp) for each turbine. Bath County Station is jointly owned by Dominion Generation (60%) and FirstEnergy (40%), and managed by Dominion. It stores energy for PJM Interconnection, a regional transmission organization in 13 states and the District of Columbia.

Design

The upper and lower reservoirs are created by earth and rock-filled embankment dams. The upper reservoir dam is 460 feet (140 m) high, 2,200 feet (670 m) long and has a structural volume of 18,000,000 cubic yards (14,000,000 m3). The upper reservoir on Little Back Creek has a surface area of 265 acres (107 ha) and storage capacity of 35,599 acre-feet (43,911,000 m3). The lower reservoir dam on Back Creek is 135 feet (41 m) high and 2,400 feet (730 m) in length. It has a structural volume of 4,000,000 cubic yards (3,100,000 m3) and creates a reservoir with a surface area of 555 acres (225 ha) and storage capacity of 27,927 acre-feet (34,447,000 m3). Connecting the upper reservoir to the power station are three water conduits between 3,100–3,600 feet (940–1,100 m) long. The conduits each lead to a 990 feet (300 m) shaft which bifurcates into two penstocks (for a total of six) before reaching the turbines. Each penstock is 18 feet (5.5 m) in diameter and between 900–1,260 feet (270–380 m) in length. Maximum static pressure from the top of the water delivery system to the turbines is 1,320 feet (400 m).

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Energy