Blue Stream

Trans-Black Sea gas pipeline

  • 3 min read
  • 5 chapters

Related on Lably

Through Pipeline, Russia and Italy

History

Preparations of the pipeline project started in 1997. In 1997, Gazprom and BOTAŞ signed a 25-year gas sale contract. One of the political goals of the Blue Stream project was to block the path of rival countries aiming to use the territory of Turkey to bring gas from the Caspian area to Europe.

The construction of the Russian land section took place in 2001–2002 and the offshore section in 2001–2002. The offshore section of the pipeline was built by Italian constructor Saipem and the Russian onshore section by Stroytransgaz, a subsidiary of Gazprom. The offshore pipe was laid by the pipe-laying vessel Saipem 7000. Gas flows from Russia to Turkey started in February 2003. However, because of the price dispute between Russia and Turkey, the official inauguration ceremony at the Durusu gas metering station took place only on 17 November 2005. Attending the inauguration were Russian President Vladimir Putin, Turkish Prime Minister Recep Tayyip Erdoğan and Italian Prime Minister Silvio Berlusconi.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Energy