Lably
Skip to content

Bundesautobahn 24

  • 1 min read
  • 3 chapters

Related on Lably

Through Germany, Berlin and Cold War

On that road, there is a 150 km (93 mi) long section that has no speed limit at all (only a recommended speed of 130 km/h), which means that about 65% of that Autobahn can be driven at very high speed.

History

Planning for the autobahn began as far back as the 1930s; before World War II numerous bridges and sections of roadside shoulder were built between Hamburg and Berlin. The German divide, however, put a hold on further work and it was not until 1978 that construction was resumed, carried out by a GDR work force and paid for by West Germany. In 1982 the A 24 could finally be opened. Most pre-war bridges could not be used, however, and were replaced by new structures.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Transportation