Lably
Skip to content

Cairo Metro Line 1

  • 3 min read
  • 4 chapters

Related on Lably

Through Cairo, Africa and Middle East

Costs

The Construction of the project started in 1982 after the French government agreed on giving Egypt the necessary loan. The first New Marg - Helwan line costs 1107 million Francs which were converted into Egyptian currency and divided into multiple stages. The total cost of the first stage from Helwan to Ramsis is E£473.9 million divided into the following:

  1. E£397 million for the tunnel between Saiyeda Senab and Ramsis with a length of 4.7 kilometres (2.9 mi) .
  2. E£74.5 million for the movement of 60 km different structures and the improvement of the older railways.
  3. E£2.4 million for the creation of a station in Dar El Salam.

The second stage coasted in total E£499.6 million and connected the (Laymoun Bridge-Marg) railway with the metro. Additional costs were made available as requested by the ministry of transportation:

  1. E£172.8 million for completing the (Ramsis-Marg) lane.
  2. E£280 million for the third stage of the (Helwan-Marg) lane.
  3. E£400 million for the (Shubra el Kheima-Ramsis-El Tahrir) lane
  4. E£2 million for the preparation study of the second lane Imbaba-El Darasa

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Transportation