Candlewood Lake

Lake in Western Connecticut, United States

  • 5 min read
  • 4 chapters

Related on Lably

Through Reservoir, Hydroelectricity and Eminent domain

Creation

Concept

On July 15, 1926, Connecticut Light and Power Company's board of directors approved a plan to create the first large-scale operation of pumped storage facilities in the US. By creating the lake and pumping it full of water from the Housatonic River, then letting the water pour down the penstock and into a turbine, the utility could produce electricity.

Candlewood Lake was formed behind a hydroelectric dam south of the Rocky River's junction with the Housatonic River in New Milford. Similar to a giant battery, its main purpose is to store water during periods of low electrical demand for power generation when demand is high. Excess electricity from the valley's hydro-system is used to pump water up a hillside into the lake from the nearby Housatonic River during spring, and overnight hours in summer. The water is then allowed to flow back down into the river when extra electricity is needed in the grid, often during the region's mid-to-late summer heat waves. Power is generated by turbines that are spun by the water flowing into the river while pumping is done by reversing the impellers.

Construction

Within a few weeks of the decision to move ahead, 50 surveyors began to scout the valley, and lawyers were hired to process the deeds transferring land held by some families since before the American Revolution into the hands of CL&P. The utility had the power of eminent domain and so some of the farmers sold their land - $2,356 for 53 acres (21 ha), $3,000 for 34 acres (14 ha), $100 for 3 acres (1.2 ha). Some of the families refused to sell so their land was taken and flooded. Inhabitants were relocated, but many of the buildings were left standing and some farming equipment was left behind. The roads were not torn up before the valley was flooded. A small cemetery in the area where the lake was built was relocated.

Starting in late July 1926, nearly 1,400 men labored to create Connecticut's largest body of water. About 500 men from Maine and Canada hand-felled 4,500 acres (1,800 ha) of woodland, burning the lumber in massive bonfires. Several dams were built. The largest, at the north end of the valley, measured 952 feet (290 m) wide and 100 feet (30 m) high upon completion.

On February 25, 1928, the first pumping operation began pouring water into the valley from the Housatonic. Engineers had planned on the Rocky River and its tributaries filling the valley one-fourth of the way, with the generating plant pumping the remaining three-fourths of the water out of the Housatonic. The valley filled quickly; on September 29, 1928, the water reached an elevation of 429 feet (131 m) above sea level, and Candlewood Lake was considered completed.

CL&P owned and operated the lake and hydroelectric power facilities until it was sold for $9 million in June 2006 due to deregulation of the electric power industry by the State in the late 1990s. The lake and generation plant are currently owned by FirstLight Power Resources.