The system was built between 1960 and 1988. Construction began after discovery of Turkmenistan's Dzharkak field in the Amu Darya Basin, and the first section of the pipeline was completed in 1960. CAC-1 and 2 were commissioned in 1969 and CAC-4 was commissioned in 1973. In 1976, two parallel lines were laid between Shatlyk compressor station and Khiva. CAC-5 was commissioned in 1985 and in 1986-88 the Dauletabad–Khiva line was connected. The western branch (CAC-3) was constructed in 1972–1975.

In 2003, the President of Turkmenistan Saparmurat Niyazov proposed to renovate existing systems and construct a new parallel pipeline to the western branch. On 12 May 2007, presidents Vladimir Putin of Russia, Nursultan Nazarbayev of Kazakhstan and Gurbanguly Berdimuhamedow of Turkmenistan signed a memorandum for renovation and expansion of the western branch of the pipeline. On 20 December 2007, Russia, Turkmenistan and Kazakhstan finalized agreement on construction of the Caspian Coastal Pipeline parallel to the existing CAC-3 pipeline (known as Bekdash–Europe pipeline or Okarem–Beineu pipeline).

On 19 December 2025 there was reported failure of the pipeline localized in the Volgograd region of the Russian Federation. The official reason given was "ground subsidence" while Ukraine DIU (HUR) claimed act of sabotage.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Energy