Change request
Declaration document
- 1 min read
- 2 chapters
Related on Lably
Through Document, System and Abstract (summary)
Purpose and elements
A change request is declarative, i.e. it states what needs to be accomplished, but leaves out how the change should be carried out. Important elements of a change request are an ID, the customer (ID), the deadline (if applicable), an indication whether the change is required or optional, the change type (often chosen from a domain-specific ontology) and a change abstract, which is a piece of narrative (Keller, 2005). An example of a change request can be found in Figure 1 on the right.
Sign in to keep reading
One more chapter is free with a Lably account.
Synonyms
Change requests have many different names, which essentially describe the same concept:
- Request For Change (RFC) by Rajlich (1999); RFC is also a common term in ITIL (Keller, 2005) and PRINCE2 (Onna & Koning, 2003).
- Engineering Change (EC) by Huang and Mak (1999);
- Engineering Change Request (ECR) at Aero;
- Engineering Change Order (ECO) by Loch and Terwiesch (1999) and Pikosz and Malmqvist (1998). Engineering Change Order is a separate step after ECR. After ECR is approved by Engineering Department then an ECO is made for making the change;
- Change Notice at Chemical;
- Action Request (AR) at ABB Robotics AB (Kajko-Mattson, 1999);
- Change Request (CR) is, among others, used by Lam (1998), Mäkäräinen (2000), Dennis, et al. (2002), Crnkovic, Asklund and Persson-Dahlqvist (2003) and at ABB Automation Products AB (Kajko-Mattsson, 1999).
- Operational Change Request (OCR).
- Enterprise Change Request (ECR).
More in Engineering
NanotechnologyTechnology with features near one nanometerSoftware engineeringEngineering approach to software developmentChemical engineeringEngineering discipline focused on the design and operation of chemical plantsAerospace engineeringBranch of engineeringASTM InternationalStandards organizationProfessional associationOrganization promoting a specific profession

