History

Full-scale construction began in 2005 with production originally planned for 2007, but the mine experienced a catastrophic water inflow in October 2006, which flooded the mine. A second inflow occurred in 2008 during the first attempt at dewatering the mine after sealing the initial inflow. Remediation efforts continued, and re-entry was successfully accomplished in 2010. Production was delayed several times with the startup dates being announced for 2011, 2013, and 2014.

On 13 March 2014, ore production began at the mine, with the mining system and underground processing circuits operational and uranium ore transported to the McClean Lake mill operated by AREVA Resources Canada located 70 km (43 mi) northeast of the minesite.

The deposit is located at depth of 450 m (1,480 ft), surrounded by and isolated within a layer of water-impermeable illite-chlorite clay, within the Athabasca Sandstone formation. Its age is estimated to be 1.3 billion years. Due to natural containment and lack of any traces of radioactive elements on the surface, the deposit is used as an example of an effective natural deep geological repository.

During 2020, production was temporarily suspended over two periods due to the risks posed by the COVID-19 pandemic: from March until September; and then from 14 December 2020. Production at Orano's McClean Lake uranium mill, which processes the ore from the Cigar Lake mine, was also suspended.

The Canadian Nuclear Safety Commission took regulatory action against owners Cameco in October 2022 due to the volume of waste material placed on waste pile C.