Crystal Lake Wind Farm

Wind Farm in Iowa, U.S.

  • 2 min read
  • 3 chapters

Related on Lably

Through Watt

Parks

Crystal Lake 1 is made up of 100 General Electric 1.6 megawatt turbines. Each turbine has a 91 meter rotor diameter. These turbines can be seen surrounding the town of Crystal Lake. Crystal Lake 1 can produce a total of 160 megawatts at peak production.

Crystal Lake 2 currently contains 80 General Electric turbines. 72 turbines produce 2.5 megawatts of power, while six other turbines are rated for 2.32 megawatts of power. These turbines all feature a 116 meter rotor diameter. Crystal Lake 2 can produce 193 megawatts of power at peak generation.

Crystal Lake 3, which signified the latest construction of turbines in Winnebago County, consists of 43 General Electric 1.5 megawatt turbines. Each turbine has an 82.5 meter rotor diameter and a front-entry hub design. Crystal Lake 3 can produce 66 megawatts of power in total.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Environment