Crystal Lake 1 is made up of 100 General Electric 1.6 megawatt turbines. Each turbine has a 91 meter rotor diameter. These turbines can be seen surrounding the town of Crystal Lake. Crystal Lake 1 can produce a total of 160 megawatts at peak production.
Crystal Lake 2 currently contains 80 General Electric turbines. 72 turbines produce 2.5 megawatts of power, while six other turbines are rated for 2.32 megawatts of power. These turbines all feature a 116 meter rotor diameter. Crystal Lake 2 can produce 193 megawatts of power at peak generation.
Crystal Lake 3, which signified the latest construction of turbines in Winnebago County, consists of 43 General Electric 1.5 megawatt turbines. Each turbine has an 82.5 meter rotor diameter and a front-entry hub design. Crystal Lake 3 can produce 66 megawatts of power in total.
Sign in to keep reading
2 more chapters are free with a Lably account.
Repowering Projects
In 2019 , a large portion of the Crystal Lake Wind Farm was repowered. The primary purpose of repowering a wind turbine is to take old or outdated equipment out of service, and to install much more efficient equipment in place.
Crystal Lake 1 was repowered from 1.5 megawatt generating equipment to 1.6 megawatt generating equipment.
Crystal Lake 2 was repowered from its original configuration of 76 Model C89 Clipper Liberty wind turbines. Each Liberty turbine produced 2.64 megawatts in optimal operating conditions. During repower, the vertical tube sections of the Clipper Liberty turbines were kept in place, while new power generation equipment, a new nacelle structure, a rear-entry hub, and new blades were installed.
Additional Operations
In 2022, Nextera Energy Resources entered into an agreement with Kossuth County to build and maintain 27 General Electric wind turbines southeast of Algona, Iowa. Total production capacity for this wind park is 69.6 megawatts.