Lably
Skip to content

Cyclone Peter

Australian region cyclone in 1978–1979

  • 6 min read
  • 2 chapters

Related on Lably

Through Australia and Sugarcane

While trekking slowly offshore the east coast of Queensland, the storm dropped very heavy rainfall, peaking at 1,947 millimetres (76.7 in) at Mount Bellenden Ker, making it the wettest tropical cyclone on record in Australia at the time. Severe flooding occurred, especially in the Cairns area. The most severe damage was dealt to sugar cane, which suffered 70 to 90 percent destruction. Some flights were canceled at the Cairns Airport due to standing water. Floodwaters forced at least 50 people to flee their homes in Cairns. A number of roads, including major highways, were flooded throughout coastal areas of Far North Queensland. Rainfall and winds also resulted in many power and telephone service outages through the region. There were two fatalities and damage reached approximately $10 million (1979 AUD; $11.4 million 1979 USD).

Meteorological history

During the final week of December 1978, an area of atmospheric convection developed over northern Australia and surrounding areas. During 28 December, an area of low pressure developed over the eastern Arnhem Land within this area of atmospheric convection. Over the next day the system moved northwestward toward the Gulf of Carpentaria and developed further, with the first gale force wind associated with the system reported from an automatic weather station on 29 December. The system was subsequently named Peter by the Australian Bureau of Meteorology (BoM) after it moved into the Gulf and developed into a Category 1 tropical cyclone on the Australian tropical cyclone intensity scale. After being named, Peter continued to intensify further as it tracked southeastward toward the Cape York Peninsula.

The system was subsequently considered to have peaked as a Category 2 tropical cyclone on 31 December, with 10-minute sustained winds estimated at 110 km/h (70 mph) by the BoM. Several hours later, the system made landfall between Aurukun and the Edward River mission, Queensland, at around 20:00 (Australian Eastern Standard Time, 11:00 UTC). As Peter made landfall during 31 December winds of 120 km/h (75 mph), were reported from both Fitzroy Island and the Edward River mission weather stations. Over the next couple of days the system gradually weakened over land, before it emerged into the Coral Sea near Cooktown, Queensland, on 1 January. The system subsequently weakened below tropical cyclone intensity and became a tropical low during 2 January. The system was last noted on the following day as it degenerated into a complex low pressure system and moved back over the Cape York Peninsula. The complex low subsequently moved westwards over the Peninsula and into the Gulf, where it developed into Tropical Cyclone Greta.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Earth science