The plant cost $150 million to construct. The plant consists of over 90,000 SunPower solar panels with single-axis trackers on 235 acres (95 ha).
FPL must obtain a permit for construction of the second stage, and has filed for the permit to build the third stage of the plant. At the second stage, 49 MW of capacity will be added. At the third stage, 226 MW of capacity is planned to be added, bringing the total capacity of the plant up to 300 MW.
Production
More in Environment
Jimmy CarterPresident of the United States from 1977 to 1981United Nations Environment ProgrammeUN environmental response agencyVulnerable speciesIUCN conservation categorySurface runoffFlow of excess rainwater not infiltrating in the ground over its surfaceCritically endangeredIUCN conservation categoryGerald FordPresident of the United States from 1974 to 1977