Lably
Skip to content

Drillship

  • 4 min read
  • 5 chapters

Related on Lably

Through Offshore drilling

History

The first drillship was the CUSS I, designed by Robert F. Bauer of Global Marine in 1955. The CUSS I had drilled in 400-foot-deep waters by 1957. Robert F. Bauer became the first president of Global Marine in 1958.

In 1961 Global Marine started a new drillship era. They ordered several self-propelled drillships each with a rated centerline drilling of 20,000 foot-wells in water depths of 600 feet. The first was named CUSS (Glomar) II, a 5,500-deadweight-ton vessel, costing around $4.5 million. Built by a Gulf Coast shipyard, the vessel was almost twice the size of the CUSS I, and became the world's first drillship built as a new construction which set sail in 1962.

In 1962, The Offshore Company elected to build a new type of drillship, larger than that of the Glomar class. This new drillship would feature a first-ever anchor mooring array based on a unique turret system. The vessel was named Discoverer I. The Discoverer I had no main propulsion engines, meaning it needed to be towed out to the drill site.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Energy