Lably
Skip to content

Empire Wind

Proposed offshore wind farm

  • 30 min read
  • 6 chapters

Related on Lably

Through Environmental impact assessment

The first phase, Empire Wind 1, has a planned capacity of 810–816 MW and was originally expected to begin operation by the mid-2020s. Due to permitting and grid interconnection delays, its completion target was pushed back by about 18 months to the end of 2026, and New York authorities now list its expected commercial operation date as 2027. Empire Wind 1 will consist of around 60–80 turbines (each with an installed capacity of more than 15 MW) and will deliver power via a subsea cable coming ashore in Brooklyn. The second phase, Empire Wind 2, is approximately 1.2 GW and was slated to come online later in the decade, bringing the project's total capacity to over 2 GW (enough to power about one million homes).

Both Empire Wind 1 and 2 were initially awarded long-term power offtake contracts by the New York State Energy Research and Development Authority (NYSERDA). The power purchase agreement for Empire Wind 2 was terminated in January 2024, but the project itself remains ongoing. Empire Wind 1's contract, which was maintained, continues toward construction and operation on the adjusted schedule. The project has achieved key regulatory milestones, including approval of an environmental review from the U.S. Bureau of Ocean Energy Management (BOEM), and approval of an onshore grid connection from New York state for Empire Wind 1's transmission line. In early 2024, Equinor agreed to take full ownership of Empire Wind (Empire Wind 1 and 2), while bp took full ownership of the separate Beacon Wind project off New England. Following this swap, Equinor re-submitted Empire Wind 1 into New York's latest offshore wind solicitation; Empire Wind 2 would be bid into a future solicitation once economic conditions improve. The first phase of the Empire Wind project (under Equinor's lead) is expected to be operational by 2027.

On 22 December 2025, the US interior department suspended Empire Wind and four other offshore wind leases (Vineyard Wind, Sunrise Wind, Coastal Virginia Offshore Wind and Revolution Wind (Rhode Island)) over what it said were 'national security concerns'. Ørsted filed a lawsuit against suspending Revolution Wind. On 12 January 2026, US district judge Lamberth has overturned this construction freeze. He said this project is likely to succeed in the ongoing legal dispute.

Lease area

Location and boundaries

The Empire Wind project is sited in BOEM lease area OCS-A 0512, located in federal waters of the Outer Continental Shelf in the New York Bight. The lease area covers approximately 79,350 acres and lies about 14 miles (12 nautical miles) south of Long Island, New York, and roughly 17 miles east of Long Branch, New Jersey. At its closest point to shore (near Jones Beach, NY), the lease boundary is about 11.5 nautical miles (~21 km) offshore. The site spans roughly 5 OCS blocks (plus 143 sub-blocks) in a triangular area extending southeast from its western edge, with water depths ranging from about 65 to 130 feet (20–40 m) across the lease area.

History of the lease area

The New York Wind Energy Area (lease area OCS-A 0512) was first proposed in 2011 via an unsolicited application by the New York Power Authority (with partners LIPA and Con Edison) to develop offshore wind in this region. In response, BOEM initiated a competitive leasing process: it issued a Request for Interest in January 2013 to gauge other developers’ interest, and after receiving multiple nominations, BOEM formally designated a New York offshore wind Call Area in 2014. Federal agencies conducted environmental reviews, including a draft Environmental Assessment (EA) in 2016. Based on stakeholder input, BOEM removed a 1,780-acre portion of the area (around Cholera Bank, a sensitive reef habitat) from leasing consideration. The final Wind Energy Area identified in March 2016 was about 2% smaller than initially proposed, resulting in the ~79,350-acre lease area. BOEM published a Proposed Sale Notice in June 2016, followed by a Final Sale Notice in October 2016 outlining the lease terms and area.

In December 2016, BOEM held a competitive auction (Atlantic Lease Sale 6) for the New York lease area. After 33 bidding rounds, Statoil Wind US LLC (now Equinor) submitted the winning bid of $42.47 million, securing the lease OCS-A 0512. The lease was officially awarded and executed in March 2017, marking the first commercial offshore wind lease off New York. Statoil later renamed the project Empire Wind, reflecting its location near the New York “Empire State” coast.

Infrastructure connections

The Empire Wind lease area is being developed as two phased projects (Empire Wind 1 and Empire Wind 2), each with separate export cable routes and grid interconnections. Empire Wind 1 will deliver power via submarine cables, making landfall in Brooklyn, New York. The export cables come ashore at the South Brooklyn Marine Terminal, where a new onshore substation will step up the voltage to 345 kV. From there, underground high-voltage cables route to the point of interconnection at ConEdison's Gowanus 345 kV substation in Brooklyn. Empire Wind 2, in turn, is planned to route its cables to Long Island. The likely landfall is in Nassau County, with an onshore substation near the existing Barrett Substation (Oceanside, NY) on the Long Island Power Authority system. Empire Wind 2 would interconnect at the Barrett 138 kV substation, linking the offshore wind farm to the Long Island electric grid. These infrastructure plans ensure that power from the offshore turbines is transmitted to New York's onshore grid via established substation points.

Additional Information

Lease area OCS-A 0512 is developed by Empire Offshore Wind LLC, a joint venture between Equinor (formerly Statoil) and BP. In 2020, BP acquired a 50% stake in the Empire Wind project from Equinor, forming a partnership to invest in and build out the lease's wind farms. The two Empire Wind projects under this lease have a combined capacity of about 2,076 MW, enough to power over 700,000 homes. In November 2023, the U.S. Department of the Interior approved Empire Wind's Construction and Operations Plan, authorizing the installation of up to 147 wind turbines and multiple offshore substations within the lease area. This federal Record of Decision marked a key regulatory milestone, clearing the way for full construction and ensuring the lease area will contribute substantially to New York State's offshore wind energy goals.

Sign in to keep reading

5 more chapters are free with a Lably account.

More in Energy