The energy problem was widely politicized in Venezuela: in addition to the drought, the Chávez government also blamed wealthy sectors of the population of the crisis, assuring that they wasted electricity. The Venezuelan opposition responded by holding the government itself responsible, accusing it of not having made the necessary investments to keep pace with the country's electricity consumption growth, as well as having neglected the electricity infrastructure, which was completely nationalized a few years before.

According to United Nations Economic Commission for Latin America and the Caribbean (ECLAC), the electricity crisis was one of the factors that contributed to the economic crisis that Venezuela experienced since 2009, which in turn is credited with giving way to the ongoing crisis in Venezuela. Furthermore, this crisis also influenced the notable increase in votes that the Venezuelan opposition experienced in the 2010 parliamentary elections.

Causes and characteristics

Venezuela, the main oil exporter in South America, suffered from a long drought that significantly reduced the volume of water in the dams of hydroelectric plants. For 2009, 73% of the electric energy consumed by Venezuelans depended on these plants. Additionally, the country's electricity consumption has been increasing by 6% per year, a percentage that exceeds the growth rate in the electrical supply that has been installed.

Most of Venezuela's power comes from one of the largest hydroelectric dams in the world, Guri Dam in Bolívar State, Venezuela on the Caroni River; as of 2019, 70–80% of Venezuela's power comes from Guri. Venezuela has a history of electrical blackouts dating at least to 2010; Juan Nagel wrote in Foreign Policy in 2016 that the problems resulted from "massive government corruption [...] and the country’s disastrous energy policies". Univision also reported that the problems in the energy sector resulted from corruption and "lack of maintenance and investment". A report from Transparency Venezuela said that maintenance was abandoned for twenty years beginning in 1998. The aging infrastructure made the problems worse, and critics were silenced; a union leader for state power workers was arrested in 2018 by the Bolivarian Intelligence Service for warning that a blackout was likely.

The private company, Electricidad de Caracas was owned by the United States' AES Corporation until 2007; according to The Wall Street Journal, "Venezuela's power grid was once the envy of Latin America". Then-President Hugo Chávez created the state-run Corpoelec by nationalizing the electric sector and expelling private industry in 2007; hence, the state has been solely responsible for energy supply for over ten years. Univision says Chávez "admitted failures (...) such as the 'insufficient' availability of the thermoelectric generation plant and the limitations of the national electric power transmission network and distribution systems"; he signed a decree in 2010 declaring a "State of Emergency of the National Electric Service". Chávez had Corpoelec speed up projects, and bypassing the process of public bidding for projects, he "authorized 'contracting by direct award'," which facilitated corruption.

Low level of the Guri reservoir

The main power plant of the hydroelectric system is the Simón Bolívar Hydroelectric Plant, with a generation capacity of 10,000 MW, but which generated only 5,000 MWh after being affected by the drought, and by the beginning of February 2010, the level of the dam had dropped nine meters below its optimum level. If the level of the Guri reservoir falls below 240 masl, some turbines in the plant could not work, and the country's electricity supply would decrease. The government foresaw that if nothing were done, this level would be reached in May 2010, so it began to execute a series of measures that seek to reduce electricity demand and minimize Venezuela's dependence on hydroelectric power plants. By the end of March 2010, this date had been postponed to June 2010.

The possibility that the Guri reservoir reached the critical level was first seen by President Hugo Chávez on 31 January 2010, by ensuring that if the companies did not reduce their electricity consumption "70% of the country would be left without electric service". On 9 March, Chávez was more emphatic about it, declaring:

The Guri is 13 meters away from what they call the collapse level. If these parameters were reached, the Guri plants would have to be turned off, which generate electricity for half of Venezuela. That is the reality.

— Hugo Chávez, 9 March 2010

Subsequently, on 18 March, the Minister of Electric Power, Alí Rodríguez Araque, accused the Venezuelan opposition of causing fear in the population by talking about a "collapse." Operating below this level is dangerous because steam could enter the turbines, a phenomenon known as cavitation, that can cause mechanical damage to them.

By April 15, 2010, the Guri reservoir reached 8.79 meters above the collapse level; however, the next day its level increased by one centimeter, the first increase reported in months. On 23 April, the Minister of the Environment, Alejandro Hitcher, assured that the Guri would reach a normal growth rate within fifteen or twenty days. However, according to Miguel Lara, former general manager of the Interconnected Systems Operation Office, the crisis continued due to problems in the thermal generation park and transmission lines, although he recognized that it is unlikely that the Guri will collapse.

Thermal park deficiency

The National Electric Corporation, the public body that manages all electricity generating companies, acknowledged that by the end of 2008, 79% of thermoelectric plants were more than 20 years old, and that 30% were unavailable due to technical problems. In addition, of the plants that were working, many did not do so at full capacity: 3,800 MW were generated, when the installed capacity was 9,051 MW.

One of the main thermoelectric plants in the country, Planta Centro, has an installed capacity of 2,000 MW, divided into five units of 400 MW each. In the last few months only two units were operational, generating about 450 MW. Although the funds to reactivate an additional unit were delivered months before, for the start of the crisis the work was 21 months behind. Subsequently, on 27 March, a unit was stopped for maintenance. By the beginning of April 2010, Planta Centro operates only with a unit of 400 MW, which is only generating 250 MW. Electrical specialists believe that Planta Centro is unlikely to recover in the short term, claiming lack of maintenance in recent years as the main cause.

Other plants presented similar situations: the Pedro Camejo plant produced 50% of its capacity "for reasons of fuel and associated transmission"; and the Josefa Camejo plant operated at 33% of its capacity. Additionally, operating plants have reduced their generation since the beginning of the crisis: Plant Tacoa in Vargas had to shut down a unit of 377 MW in April, and plant Ramon Laguna stopped two machines that generated 253 MW in Zulia.

Disparity in the increase in demand and electric supply

Even before the 2009-2010 drought, there was already a disparity between the increase in supply and demand for electricity in Venezuela; the latter had been increasing at a rate of 7% per year since 2005. This deficit has been criticized by the opposition, alleging that in previous years the Venezuelan government did not make the necessary investments to increase power generation capacity at the same rate as the increase in demand. On the other hand, the government has accused sectors of the population of "wasting" electricity, and has highlighted the fact that Venezuela is the country with the highest electricity consumption per capita in Latin America.

According to figures from the Office of Operation of Interconnected Systems, the Chávez government completed less than half of the investments in thermoelectric energy generation planned in 2005. Alí Rodríguez has denied that the government has not made the necessary investments, although he acknowledged that there are delays in the execution of projects.

Saturation of distribution and transmission lines

On 21 April 2010, a power cut was reported from the east to the west of the country, affecting 15 of the 24 states of Venezuela. Due to the distribution of the fault, Ciro Portillo, former vice president of Enelven, has assured that it is due to overload in one of the three transmission lines that start from the Guri. Before the crisis, the transmission lines were transmitting 1,000 MW over their capacity during the peak hours. The high temperatures Venezuela experiences between April and May also influence the saturation of these lines. The company Enelven, responsible for the affected areas, has not reported on the causes of this energy slump. For its part, the National Management Center has reported that Cadafe-Occidente overloads transmission lines daily.