Félou Hydroelectric Plant
- 1 min read
- 1 chapters
Related on Lably
Through World Bank Group
At maximum output the three 21 MW turbines pass a total of 500 cubic metres per second (18,000 cu ft/s) of water. Between August and November the water flowing in the river generally exceeds this value allowing the plant to operate at full capacity and the excess water to pass over the weir. During the dry season (December to July) the electricity generated is reduced to about a third of the maximum output as the flow of water is limited to the 150–200 cubic metres per second (5,300–7,100 cu ft/s) released from the Manantali Dam.
The total estimated cost is 241 million US dollars. The construction of the plant was completed in 2014.