Lably
Skip to content

Geosynchronous Satellite Launch Vehicle

Class of Indian medium-lift expendable launch vehicles, developed by ISRO

  • 6 min read
  • 4 chapters

Related on Lably

Through ISRO and Polar Satellite Launch Vehicle

History

The Geosynchronous Satellite Launch Vehicle (GSLV) project was initiated in 1990 with the objective of acquiring an Indian launch capability for geosynchronous satellites.

GSLV uses major components that are already proven in the Polar Satellite Launch Vehicle (PSLV) launch vehicles in the form of the S125/S139 solid rocket booster and the liquid-fueled Vikas engine. Due to the thrust required for injecting the satellite in a geostationary transfer orbit (GTO) the third stage was to be powered by a LOX/LH2 Cryogenic engine which at that time India did not possess or have the technological expertise to build. The aerodynamic characterization research was conducted at the National Aerospace Laboratories' 1.2m Trisonic Wind Tunnel Facility.

The first development flight of the GSLV (Mk I configuration) was launched on 18 April 2001 was a failure as the payload failed to reach the intended orbit parameters. The launcher was declared operational after the second development flight successfully launched the GSAT-2 satellite. During the initial years from the initial launch to 2014 the launcher had a checkered history with only 2 successful launches out of 7, resulting in the rocket gaining the nickname "naughty boy". Currently managed as the GSLV Continuation Programme, contracts for the rocket launches from the Indian government are awared in phases, with the latest beign phase 4, covering launches of 2-tonne strateegic missions from 2020 onwards.

Cryogenic engine controversy

The third stage was to be procured from Russian company Glavkosmos, including transfer of technology and design details of the engine based on an agreement signed in 1991. Russia backed out of the deal after United States objected to the deal as in violation of the Missile Technology Control Regime (MTCR) in May 1992. As a result, ISRO initiated the Cryogenic Upper Stage Project in April 1994 and began developing its own cryogenic engine. A new agreement was signed with Russia for 7 KVD-1 cryogenic stages and 1 ground mock-up stage with no technology transfer, instead of 5 cryogenic stages along with the technology and design as per the earlier agreement. These engines were used for the initial flights and were named GSLV Mk I.

Retirement

As of October 2024, ISRO has stopped selling GSLV Mk II Rockets. Eight known launches are planned with NVS Missions, IDRSS Missions, NISAR Mission. Unlike the other Rocket families developed by ISRO, the agency has not invited private agencies to develop the GSLV-Mk2 rocket. ISRO cites its cost per lauch as higher, as fewer GSLV rockets have been developed and launched. At the end of 2025, flight components from GSLV-F12, GSLV-F14, GSLV-F15, and GSLV-F16 are reported to still be in earth orbit as Space Junk.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in India