Through Renewable energy, Watt and World Bank Group

With 2,653 MW of installed capacity as of year-end 2024—reflecting additions such as the Sorik Marapi and Salak expansions—Indonesia ranked second in the world after the United States (3,937 MW) in installed geothermal power capacity, ahead of the Philippines. By 2025, Indonesia's Ministry of Energy and Mineral Resources reported that installed geothermal capacity had reached 2,744 MW (about 2.71 GW). In 2007, geothermal energy represented 1.9% of the country's total energy supply and 3.7% of its electric power.

At the 2010 World Geothermal Congress in Bali, President Susilo Bambang Yudhoyono announced a plan to build 44 new geothermal plants by 2014, more than tripling capacity to 4,000 MW. By 2025, Indonesia aims to produce more than 9,000 MW of geothermal power, becoming the world's leading geothermal energy producer. This would account for 5% of Indonesia's total energy needs.

A detailed report on the geothermal sector in Indonesia issued in 2015 by the Asian Development Bank and World Bank, Unlocking Indonesia's Geothermal Potential, indicated that reforms in key areas of policy were likely to be needed to stimulate sustained expansion in the sector.

History

The first proposal on energy from volcanoes came in 1918 during the Dutch colonial era. In 1926, five test borings were drilled in Java's Kawah Kamojang field, the third being the first that was successful. In the early 1980s, it was still discharging superheated steam from a depth of 66 metres at a temperature of 140 °C and a pressure of 3.5 to 4 bars. A prefeasibility study for electricity generation was initiated in 1972 by Geothermal Energy New Zealand. The first generator was inaugurated in 1983 by President Suharto and subsequently expanded in 1987.

Since the mid-1980s, Chevron, the world's largest geothermal power producer, has operated two geothermal fields in West Java at Salak and Darajat with a combined capacity of around 365 MW. Between 1989 and 1997, explorations were conducted at the Sibayak geothermal field in northern Sumatra, and subsequently a 12 MW plant has been placed in operation.

In 1991, the Indonesia Geothermal Association (Asosiasi Panasbumi Indonesia - API), a non-governmental organisation, was established to promote and advertise geothermal energy. It has approximately 500 members including geothermal experts, companies, and stakeholders. The Wayang Windu Geothermal Power Station in West Java, owned by British Star Energy, has been in operation since 2000. It currently comprises two units with a total capacity of 227 MW. There are plans for a third unit of 127 MW which is expected to be on-stream by mid-2013.