Geothermal power in the United Kingdom

  • 11 min read
  • 5 chapters

Related on Lably

Through Petroleum, Enthalpy and Tectonics

The potential for exploiting geothermal energy in the United Kingdom on a commercial basis was initially examined by the Department of Energy in the wake of the 1973 oil crisis. Several regions of the country were identified, but interest in developing them was lost as petroleum prices fell. Although the UK is not actively volcanic, a large heat resource is potentially available via shallow geothermal ground source heat pumps, shallow aquifers and deep saline aquifers in the mesozoic basins of the UK. Geothermal energy is plentiful beneath the UK, although it is not readily accessible currently except in specific locations.

Geothermal energy in the United Kingdom has significant potential. The country's geothermal resources could theoretically meet all of its heating demand for the next century. Recent developments, particularly in Cornwall such as the Eden Project and the Langarth Garden Village, include geothermal heating plants and power projects, with plans to generate 12 MW of electricity by 2027. However, challenges such as lack of government support, financial incentives, and a clear regulatory framework hinder broader adoption. With better policy, the UK could establish up to 360 plants by 2050, reducing carbon emissions and providing jobs.

History

Ancient legend credited the early Celtic kings with the discovery of the thermal springs at the Roman Baths in Aquae Sulis (modern city of Bath) which then fell into disrepair during the Dark Ages and were not rediscovered until the 18th century, along with the springs at Buxton in the Peak District.

The geothermal potential of the UK was investigated by a program funded by the UK government and the European Commission that ran from 1977 until 1994, and saw a Hot Dry Rock experiment drilled in Carnmenellis granite of Cornwall. The project, which was never intended to produce electricity, was a rock mechanics experiment to research the hydraulic stimulation of fracture networks at temperatures below 100 °C (212 °F). Three wells were drilled to a total vertical depth of 2.6 km (1.6 miles) where the bottom-hole temperature was around 100 °C. In 1994, the Hot Dry Rock project was closed, and research effort was transferred to the European Geothermal Project at Soultz-sous-Forêts.

Geothermal energy development in the UK has been limited, partly due to the lack of high enthalpy resources, but also due to the availability of cheap fossil fuels. However, when comparisons are made to countries in a similar tectonic setting, it is clear that the UK is underutilising this potential resource. The lack of geothermal development has largely been a result of the availability of North Sea natural gas during the 1980s and 1990s.

Interest in the geothermal energy resources of the UK rose again in the 2000s, as a potential way of addressing some of the UK's "energy gap"