Lably
Skip to content

Glenmore Reservoir

Reservoir in Calgary, Alberta

  • 7 min read
  • 4 chapters

Related on Lably

Through Reservoir, Flood and Drainage basin

The reservoir’s perimeter features a scenic, uninterrupted 16km multi-use pathway/pedestrian and cycling trail along the water’s edge, connecting popular city destinations such as the Heritage Marina beach, Heritage Park Historical Village, South Glenmore Park, Glenmore Sailing Club, Weaselhead Flats Natural Environment Park, North Glenmore Park, Calgary Canoe Club, Calgary Rowing Club, and the Earl Grey Golf Club Archived 2024-04-18 at the Wayback Machine.

The reservoir has a water mirror of 3.84 km2 (1.48 sq mi) and a drainage basin of 1,210 km2 (470 sq mi). From 2017 to 2020, the City of Calgary rehabilitated and upgraded the Glenmore Dam at a cost of $81 million.

The reservoir is bordered to the west by the Tsuut’ina Nation reserve, to the north by the communities of Lakeview and North Glenmore, to the east by the neighbourhood Eagle Ridge (which sits on the peninsula alongside Heritage Park), and to the south by the communities of Oakridge, Palliser, and Pump Hill.

History

The Glenmore Reservoir is located on land originally settled by Calgary pioneer Sam Livingston, who gave the area the name Glenmore (Gaelic for "big valley").

The City of Calgary began contemplating the need for a new source of drinking water in the early 1900s. City Alderman John Goodwin Watson proposed a gravity water supply fed from the Elbow River in April 1907. The issue of water scarcity and runoff continued to compound in the 1920s with the Calgary Herald reporting the muddy conditions of the Elbow and Bow River in April 1926. The city retained Canadian architecture firm Gore, Naismith and Storrie to study the inadequate and frequently contaminated water supply in July 1929, with the firm recommending 12 remediation options, including the Glenmore Dam and Reservoir.

The City of Calgary would eventually receive approval for a dam and reservoir from the Government of Canada under the Irrigation Act in the late 1920s. The final step was approval from the electorate, which came in the form of a plebiscite during the 1929 Calgary municipal election. The electors of Calgary approved a bylaw to borrow $2.77-million for the project and other waterworks improvements.

With the necessary federal approval and financing in place, the city began purchasing land in the area necessary to complete the project. This including 539.5 acres from the Tsuu T'ina Nation (formerly the Sarcee Indian Reservation). The final price paid was $50 per acre, totaling $29,675. The purchase was negotiated by lawyer Leonard Brockington on behalf of the city. Brockington was known by the Tsuu T'ina Nation, and had previously been given the name "Chief Yellow Coming Over the Hill", and as a condition of the sale, Brockington was bestowed the name "Chief Weasel Head" after the traditional name of the area to ensure the name would continue to live on. The city had independently valued the Tsuu T'ina land at $32,642.50, a difference of $2,596.50 over the final price. Other land owners in the area were paid between $111 and $400 per acre for the project.

Mayor Andrew Davison turned the first sod in a ceremony on July 26, 1930, to inaugurate the largest infrastructure project undertaken by the city to date. First concrete was poured on October 13, 1930, and in the fall of 1931 McDiarmid began construction of the water purification plant.

The expensive land purchases and growing cost of the project led to a judicial inquiry headed by Supreme Court of Alberta Justice Albert Ewing in 1932. The inquiry investigated all aspects of the project's financing including land acquisitions, awarding of contracts, labour practices and management. The final report by Justice Ewing found no evidence of wrongdoing.

The dam was completed and became operational on January 19, 1933, which happened without an official ceremony. A public open house was held one week afterwards, which was attended by thousands of Calgarians.

When the area flooded (by the summer of 1933), part of the Livingston house was preserved and now stands in Heritage Park, which borders the reservoir.

The design estimated capacity for serving a population of 200,000, but by 1949 the system was reported as "under near-constant strain" with a population of 105,000 Calgarians. The city completed a $1.5-million filtration extension in 1957 which doubled the water capacity. Additional capacity was added again in 1965 with eight filter beds and a high lift pumping station. Administration and a research laboratory were completed in 1979. The city subsequently constructed the Bearspaw Treatment plant in 1972 on the Bow River to supplement the city's water supply.

2005 flood

Although the dam usually provides effective flood protection, a major flood in June 2005 caused the reservoir to exceed its capacity. The excess spilled over the dam and into the river. The flow downstream increased from its normal average of 20-30 cubic metres per second up to 350 cubic metres per second. As a result, some roads were closed and 2,000 Calgarians who lived downstream were evacuated. The Glenmore water treatment plant had difficulty treating the heavily silted water, which caused the municipal government to issue water restrictions. Environment Canada noted the 2005 Alberta floods were a 200-year flood occurrence.

2013 flood

In June 2013, heavy rainfall west of the city caused the reservoir to exceed its capacity. As it did in 2005, excess water spilled over the dam and into the Elbow River, with downstream flows up to 544 cubic metres per second. 75,000 people from 26 neighbourhoods in the vicinity of the Bow and Elbow rivers were placed under a mandatory evacuation order as the rivers spilled over their banks and flooded neighbourhoods. City officials urged Calgarians, particularly the 350,000 people who worked downtown, to stay home and limit non-essential travel. Unlike the 2005 flood, the Glenmore water treatment facility had no difficulty treating water. City officials did, however, implement municipal outdoor watering restrictions to ensure water quality remained high throughout the incident. Government officials called the flooding the worst in Alberta's history. After the flood, studies commissioned by the city and province investigated the construction of a $457 million tunnel to divert water from future flooding.

2018-2020 Upgrades

In 2018, a three-year project began to upgrade the ageing Glenmore Dam, increasing its capacity and improving its flood resistance. The dam itself was rehabilitated; 2.5m steel gates were added to the top of the dam which increased capacity by roughly 10 billion litres; and the bridge deck atop the dam was replaced in order to create more space for pathway users. This $81 million project also involved drawing down the reservoir during 2018 to the point that only hand launched boats were able to use the reservoir for sailing, and Heritage Park's S.S. Moyie paddlewheeler was forced to remain in drydock.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Physical geography