Lably
Skip to content

GOES 13

U.S. Space Force weather satellite

  • 5 min read
  • 3 chapters

Related on Lably

Through Indian Ocean and Longitude

GOES-13 arrived at 61.5° East longitude in mid-February 2020. The satellite was renamed EWS-G1 and became fully operational over the Indian Ocean basin on September 8, 2020. EWS-G2 (GOES-15) was drafted to replace it in September 2023.

EWS-G1's last image was captured on October 31, 2023.

Launch

GOES-N was launched aboard a Boeing Delta IV-M+(4,2) rocket, flying from SLC-37B at the Cape Canaveral. The launch occurred at 22:11:00 UTC on 24 May 2006.

The launch had been delayed significantly due to a number of issues. First, it had been scheduled to fly on a Delta III, but after three consecutive failures on its first three flights, the Delta III was canceled, with GOES launches being transferred to the Delta IV. Further delays were caused after the previous Delta IV launch, the maiden flight of the Heavy configuration, suffered a partial failure. Then, two launch attempts in August 2005 were scrubbed, the second attempt just four minutes and 26 seconds prior to liftoff.

After these launch attempts, the rocket's flight termination system batteries expired, requiring replacement. A strike by workers at Boeing subsequently pushed the launch back to May 2006.

Sign in to keep reading

2 more chapters are free with a Lably account.

More in Earth science