Lably
Skip to content

Greenland Ice Sheet Project

  • 2 min read
  • 2 chapters

Related on Lably

Through Switzerland, Field research and Logistics

The preliminary GISP field work started in 1971 at Dye 3 (65°N 43°W / 65°N 43°W), where a 372 meter deep, 10.2 cm diameter core was recovered. After this, annual field expeditions were carried out to drill intermediate depth cores at various locations on the ice sheet. The first was a 398 m core at Milcent and another was a 405 m core at the Crete station in 1974. After working out various logistical and engineering problems related to the development of a more sophisticated drilling rig, drilling to bedrock at Dye 3 began in the summer of 1979 using a new Danish electro-mechanical ice drill. In the first year, an 18 cm diameter hole was drilled and cased to a depth of 80 m. Coring continued for two more seasons, and on August 10, 1981, bedrock was reached at a depth of 2037 m. The Dye 3 site was a compromise: glaciologically, a higher site on the ice divide with smooth bedrock would have been better; logistically, such a site would have been too remote.

GISP drilling operations

Sign in to keep reading

One more chapter is free with a Lably account.

More in Earth science