Hanul Nuclear Power Plant

Nuclear power station in South Korea

  • 1 min read
  • 1 chapter

Related on Lably

Through South Korea and Watt

On 4 May 2012, ground was broken for two new reactors, Shin ("new") Uljin-1 and -2 using APR-1400 reactors.

Fuel loading completed at Shin Hanul 1 in October 2021. Unit 1 achieved first criticality on 22 May 2022, 11 am local time with electricity generation expected to start in June 2022. Unit 2 achieved criticality on 6 December 2023, 6 am local time, with grid connection expected for 20 December 2023.

The APR-1400 is a Generation III PWR design with a gross capacity of 1400 MW. It is the first to use Korean-made components for all critical systems. In 2012, the reactors were expected to cost about 7 trillion won (US$6 billion), and to be completed by 2018.

In September 2024 South Korea's Nuclear Safety and Security Commission issued a licence to Korea Hydro & Nuclear Power for the construction of units 3 and 4 of the Shin Hanul nuclear power plant, scheduled to be completed by 2032 and 2033, respectively.