Lably
Skip to content

HTR-PM

Chinese small modular nuclear reactor

  • 2 min read
  • 2 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

The first plant has an electrical output of 210 MW. It began producing power in December 2021 and started commercial operation in late 2023.

Technology

The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed reactor. While the German AVR and THTR-300, operating from 1969 to 1988, were the first pebble-bed reactors and operated at similar temperatures, the HTR-PM is the first such design using modular construction and the second small modular reactor, following Russia's Akademik Lomonosov floating plant in 2019. It is a generation IV design. The technology is based on the HTR-10 prototype reactor.

The reactor unit has a thermal capacity of 250 MW. Two reactors are connected to a single steam turbine to generate 210 MW of electricity (210 MWe).

The reactor is inherently safe, because even if the primary loop loses power, it will cool passively and will not suffer a meltdown. Even if the coolant pipes of the primary loop rupture and detach from the reactor core (damage beyond baseline design), the core does not melt down and will cool itself through natural convection, without releasing radioactive materials.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Energy