Humboldt Bay Nuclear Power Plant

Decommissioned nuclear power plant in California

  • 4 min read
  • 5 chapters

Related on Lably

Through Fault (geology)

History

On Monday, January 23, 1961, Pacific Gas and Electric held a luncheon to invite the community to observe the start of the major construction of the nuclear unit. Once completed, the plant had cost $65 million to build and was commissioned in August 1963.

"According to federal documents, in July of 1970, an operator error caused a sudden loss of power to the cooling water, prompting the water level above the active fuel to plummet to just over 6 inches. The normal water level was 9 feet above fuel." Radioactive steam was vented into the building but not into the environment, according to PG&E at the time. The fuel rods were damaged but not "severely," according to Nuclear Regulatory Commission reports.

The plant was shut down for refueling and seismic upgrades in July 1976, which dragged on due to changing requirements. Concern about previously undiscovered seismic faults combined with more stringent requirements required after the Three Mile Island accident rendered the small plant unprofitable if restarted.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Environment