Through Japan

On 13 December 2017, the Hiroshima High Court issued a temporary injunction to halt the operation of the Ikata 3 nuclear reactor until September 2018. The injunction was revoked in March 2021 and Ikata 3 was restarted in December 2021.

The plant is on a site with an area of 86 hectares (210 acres); 47% of the plant site is green, in comparison the non-nuclear plants Shikoku Electric operates are 13.8, 20.1, 21.2 and 45.5%.