Indravati Dam
- 1 min read
- 3 chapters
Related on Lably
Through Godavari River and Watt
Characteristics
The height of the Dam is 45 m (148 ft) and the length is 539 m (1,768 ft).
Sign in to keep reading
2 more chapters are free with a Lably account.
History
Prior 1947 Late HH Maharaja PK Deo had already envisioned the project, and played a pivotal role afterwards. The main purpose of the dam was Hydroelectricity and irrigation. The project was operating and maintaining by Govt. of Odisha and Water Resources Department. The dam was completed by Govt. of Odisha in 1996.
Hydroelectric Project
The Upper Indravati Project envisages diversion of water of the Indravati river in its upper reaches into the Mahanadi river basin for power generation and irrigation. In addition to the power house, the project involved construction of 4 dams across the Indravati and its tributaries, 8 dykes and two inter-linking channels to form a single reservoir with a live capacity of 1,435.5 Million m3 and a barrage across Hati river in Mahanadi river basin.

