Istanbul Metro

Istanbul railway network

  • 17 min read
  • 10 chapters

Related on Lably

Through Urban area, London Underground and Paris

The system consists of eleven lines: the lines designated M1A, M1B, M2, M3, M6, M7, M9 and M11 are on the European side of the Bosporus, while lines M4, M5 and M8 are on the Asian side. Due to Istanbul's unique geography and the depth of the Bosporus strait which divides the city, the European and Asian metro networks do not connect directly. The two parts of the city are linked through the Marmaray commuter rail line, which is connected to the metro in several places. Three metro lines are under construction on the Asian side: M10 (Pendik Merkez–Fevzi Çakmak), M12 (60. Yıl Parkı–Kazım Karabekir), M13 (Istanbul Metro)|M13]] (Emek-Yenidoğan) and M14 (Altunizade–Bosna Bulvarı). Additionally, extension works on the M1B and M7 lines (on the European side) and the M4 line (on the Asian side) are underway.

In addition to the Marmaray commuter rail, the metro connects to the F1, Tünel (F2), F3 and F4 funicular lines and with the network of the Istanbul Tram, Metrobüs and the cable cars.

History

The oldest underground urban rail line in Istanbul is the Tünel, which entered service on 17 January 1875. It is the world's second-oldest underground urban rail line after the London Underground which was built in 1863, and the first underground urban rail line in continental Europe, however this is not recognised as the opening of the metro due to the line being Funicular.

The first master plan for a full metro network in Istanbul, titled Avant Projet d'un Métropolitain à Constantinople and conceived by the French engineer L. Guerby, dates to 10 January 1912. The plan comprised a total of 24 stations between the Topkapı and Şişli districts and included a connection through the Golden Horn. Each station would have a 75-metre (246 ft 1 in) platform next to the rail line, while the distance between stations varied from 220 to 975 metres (721 ft 9 in to 3,198 ft 10 in). The blueprints of the project, which was never realized, are today displayed at the Istanbul Technical University Museum.

In 1936 the French urban planner Henri Prost proposed a metro network between the districts of Taksim and Beyazıt, to the north and south of the Golden Horn, respectively. In October 1951 the Dutch firm Nedeco proposed a similar route between Taksim and Beyazıt, and in September 1952 the Director of the Paris Transportation Department, Marc Langevin, prepared a 14-chapter report together with his associate Louis Meizzonet for the implementation of the project and its integration with the other means of public transportation in the city. However, these plans never came into effect and all proposals were put on hold until 1987, when the planning for the current Istanbul Metro was made.

Construction works for the first 'modern' mass transit railway system started in 1989, with the first stations opening in September. İstanbul Ulaşım A.Ş. (now known as Metro Istanbul) was founded the previous year to operate the system. The M1 was initially called "Hafif Metro" (which literally translates as "light metro"). Although it was built as a fully grade separated line, the M1 line operates with shorter trainsets and shorter station platforms than is standard on a traditional metro line, hence its "light metro" designation. The M1 line was later extended from Aksaray towards the western suburbs, reaching Atatürk Airport in the southwest in 2002.

Construction of the M2 line began on 11 September 1992, but faced many challenges due to the numerous archaeological sites that were discovered during the drilling process, which slowed down or fully stopped the construction of many stations, especially in the south. Taking into account the seismic activity in Istanbul, the entire network was built with the cut-and-cover method to withstand an earthquake of up to 9.0 on the Richter magnitude scale.

The first section between Taksim and 4. Levent entered service, after some delays, on 16 September 2000. This line is 8.5 km (5.28 mi) long and has 6 stations, which all look similar but are in different colours. In 2000, there were 8 Alstom-built 4-car train sets in service, which ran every 5 minutes on average and transported 130,000 passengers daily. On 30 January 2009, the first train sets built by Eurotem entered service. Eurotem will build a total of 92 new trainsets for the M2 line. As of 30 January 2009, a total of 34 trainsets, each with 4 cars, were being used on the M2 line. A northern extension from 4. Levent to Maslak was opened on 30 January 2009. On 2 September 2010, the northern (temporary) terminus of Darüşşafaka followed up. The southern extension of the M2 line from Taksim to Yenikapı, across the Golden Horn with Haliç station on the bridge and underground through the historic peninsula, entered service on 15 February 2014. The Taksim-Yenikapı extension is 5.2 km (3.23 mi) long, with four stations. The total cost of the extension was $593 million. At Yenikapı, it will intersect with the extended M1 line and the Marmaray commuter line, which since its opening in 2013 has offered a connection between the Asian and European sides of the city.

The trip between the Şişhane station in Beyoğlu and the Haciosman station in Maslak is 20 km (12.43 mi) long and takes 27 minutes; including Şişhane - Taksim (1.65 km (1.03 mi), 2 minutes), Taksim - 4. Levent (8.5 km (5.28 mi), 12 minutes), and 4. Levent - Haciosman (8.1 km (5.03 mi), 12 minutes.) The total length of the European side of the M2 line will reach 23 km (14.29 mi) when all 16 stations from Hacıosman to Yenikapı will be completed; not including the 93-metre (305 ft 1 in)-long Golden Horn Metro Bridge, the 0.6 km (0.37 mi) long Taksim-Kabataş tunnel connection with the Seabus port, and the 0.6 km (0.37 mi) long Yenikapı-Aksaray tunnel connecting the M1 line to the Yenikapı Transfer Center.

On the Asian side, construction is in progress of the remaining portion of the 26.5 km (16.47 mi) long M4 line from Kadıköy to Kaynarca, yielding a total of 19 stations. It cost €751 million and was built by the Astaldi / Makyol / Gülermak consortium. The first section opened on 17 August 2012, terminating in Kartal. Construction of the 20 km (12.43 mi) long M5 line from Üsküdar via Ümraniye to Çekmeköy started in March 2012.