Lably
Skip to content

Jännersdorf Solar Park

  • 1 min read
  • 1 chapters

Related on Lably

Through Germany, Watt and Kilowatt-hour

The project is built on a former military training area on 90 hectares (220 acres). The project is equipped with 167,550 photovoltaic modules, with 25.6 MW from Trina Solar, 9.6 MW from Suntech Power and 5.3 MW from Hareon. The solar park was connected to the grid on 30 June 2012.

More in Energy