Karuma–Juba High Voltage Power Line

Planned power line in Uganda and South Sudan

  • 2 min read
  • 4 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

Location

The 400kV power line, begins at the 400kV substation at Karuma Hydroelectric Power Station. The line travels in a north-westerly direction to Olwiyo, in Nwoya District, in the Northern Region of Uganda. This distance is approximately 56 kilometres (35 mi).

At Olwiyo, the line takes a general northerly direction to Elegu at the international border with South Sudan, a distance of about 140 kilometres (87 mi). The distance traveled by this power line in Uganda is therefore approximately 196 kilometres (122 mi).

After crossing the international border into South Sudan, the line travels through Nimule, in Imatong State to Juba, the capital city of South Sudan, a distance of approximately 195 kilometres (121 mi)