Kawanda–Birembo High Voltage Power Line

High voltage electricity transmission line in Uganda and Rwanda

  • 3 min read
  • 5 chapters

Related on Lably

Through World Bank Group and European Union

Location

The 220 kilovolt power line starts at the Uganda Electricity Transmission Company Limited power station at Kawanda, Wakiso District, in Uganda's Central Region, approximately 15.5 kilometres (10 mi), by road, north of Kampala, the capital and largest city of Uganda. From here, the line travels to the southwestern Ugandan city of Masaka, a straight-line distance of about 121 kilometres (75 mi). From Masaka, the power line continues west to the city of Mbarara, a straight distance of approximately 130 kilometres (81 mi). From Mbarara the power line travels in a general southerly direction to the town of Mirama Hills, a distance of about 66 kilometres (41 mi). From a substation in the Mirama Hills/Kagitumba neighborhood, the power line continues in a southwesterly direction to end at a substation in Birembo, Kinyinya Sector, Gasabo District, Rwanda, in the northern suburbs of Kigali, the capital and largest city of Rwanda, a straight-line distance of about 110 kilometres (68 mi).

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Energy