The 220 kilovolt power line starts at the Rwanda Energy Group (REG) 220kV substation in the town of Kigoma Rwanda, approximately 76.5 kilometres (48 mi), by road, southwest of Kigali, the capital and largest city of Rwanda. From here, the power line travels to the southern Rwandan town of Butare (Huye), a road distance of about 51 kilometres (32 mi). From Butare, the power line continues south to the international border with Burundi. It crosses the border and continues to the town of Ngozi, a road distance of approximately 75 kilometres (47 mi)

From Ngozi, power line travels in a general southerly direction to the city of Gitega, the capital of Burundi, a road distance of approximately 83 kilometres (52 mi), ending at another 220kV substation, this one owned by REGIDESO Burundi. The length of this power line is reported to be 140.7 kilometres (87 mi) from end to end, with 61.5 kilometres (38 mi) in Rwanda and 79.2 kilometres (49 mi) in Burundi.

Sign in to keep reading

4 more chapters are free with a Lably account.

More in Energy