Kingsway Tunnel

  • 2 min read
  • 2 chapters

Related on Lably

Through Tunnel, Bill (law) and European Union

History

Annual vehicle usage of the Queensway Tunnel had exceeded 11 million by 1959, causing severe traffic congestion at peak commute times, partially as a result of low toll costs. It was evident that a significant capacity increase was required, with considerations on various bridge and tunnel schemes ultimately concluding with a second tunnel as the favoured option, funded by tolls. In 1965, parliamentary powers granted construction of a new two-lane tunnel, approximately 1 mile downstream from the existing tunnel. A further bill for the tunnel's construction was promoted in 1967 with approval given in 1968, upon which construction started immediately.

Construction

The project was authorised by the Mersey Tunnel (Liverpool/Wallasey) &c. Act 1965 (c. xl). Edmund Nuttall Limited. Construction took around five years to fully complete. The approach to the tunnel on the Wirral side uses the former railway cutting that carried the Seacombe branch line. It was officially opened by Queen Elizabeth II on 24 June 1971. At first, only the southernmost tunnel was open for traffic, one lane in each direction. The northernmost tunnel was completed in 1974 and opened to traffic on 13 February 1974.

Mersey Tunnel 10k

There is an annual 10k run that passes through the Kingsway Tunnel, starting in Liverpool city centre with the finish line in New Brighton. This is the only time during the year when one can travel through the tunnel on foot. In 2024, more than 2,000 people registered to take part in the event.

Sign in to keep reading

One more chapter is free with a Lably account.

More in Regions and countries