KTX

High-speed rail system of South Korea

  • 31 min read
  • 6 chapters
KTX-Sancheon #07
Minseong Kim · CC BY-SA 4.0

Related on Lably

Through Build–operate–transfer

The KTX services now radiate from Seoul Station toward destinations across the nation, competing against SRT services from Suseo station, except Jungbunaeryuk Line which depart from Pangyo station.

The current maximum operating speed for trains in regular service is 305 km/h (190 mph), though the infrastructure is designed for 350 km/h (217 mph).

The initial rolling stock was based on Alstom's TGV Réseau, and was partly built in Korea. The domestically developed HSR-350x, which achieved 352.4 km/h (219.0 mph) in tests, resulted in a second type of high-speed trains now operated by Korail, the KTX-Sancheon, which entered into commercial service in 2010.

The next generation experimental electric multiple unit prototype, HEMU-430X, achieved 421.4 km/h (261.8 mph) in 2013, making South Korea the world's fourth country after Japan, France and China to develop a high-speed train running on conventional rail above 420 km/h (260 mph). It was further developed into commercialized variants, namely KTX-Eum and KTX-Cheongryong, with respective maximum service speeds of 260 km/h (160 mph) and 320 km/h (200 mph), which entered into KTX services in 2021 and 2024, respectively.

History

Initial planning

The Seoul–Busan axis is Korea's main traffic corridor. In 1982, it represented 65.8% of South Korea's population, a number that grew to 73.3% by 1995, along with 70% of freight traffic and 66% of passenger traffic. With both the Gyeongbu Expressway and Korail's Gyeongbu Line congested as of the late 1970s, the government saw the pressing need for another form of transportation.

The first proposals for a second Seoul–Busan railway line originated from a study prepared between 1972 and 1974 by experts from France's SNCF and the Japan Railway Technical Service on a request from the IBRD. A more detailed 1978–1981 study by KAIST, focusing on the needs of freight transport, also concluded that separating long-distance passenger traffic on a high-speed passenger railway would be advisable, and it was adopted in the following Korean Five Year Plan.

During the subsequent years, several feasibility studies were conducted for a high-speed line that aimed to reduce the travel time between Seoul and Busan to just 1 hour and 30 minutes. These studies yielded positive results. In 1989, after receiving the green light for the project, the necessary institutions were established to oversee its preparation. These institutions included the Gyeongbu High-Speed Electric Railway & New International Airport Committee and the High-Speed Electric Railway Planning Department, which was later renamed the HSR Project Planning Board. By 1990, the planned travel time between Seoul and Busan had been reduced to 1 hour and 51 minutes, and the project was scheduled to be completed by August 1998. and costs were estimated at 5.85 trillion South Korean won (₩) in 1988 prices, 4.6 trillion of which were to be spent on infrastructure, the remainder on rolling stock.

As planning progressed, the Korea High-Speed Rail Construction Authority (KHSRCA) was established in March 1992 as a separate body with its own budget responsible for the project. In the 1993 reappraisal of the project, the completion date was pushed back to May 2002, and cost estimates grew to ₩10.74 trillion. 82% of the cost increase was due to a 90% increase in unit costs in the construction sector, mostly labor costs but also material costs, and the remainder due to alignment changes. To finance the project, the option of a build-operate-transfer (BOT) franchise was rejected as too risky. Funding included direct government grants (35%), government (10%) and foreign (18%) loans, domestic bond sales (31%) and private capital (6%).

Construction of Gyeongbu high-speed line

Start of construction

KHSRCA started construction of the Seoul–Busan Gyeongbu high-speed railway (Gyeongbu HSR) on June 30, 1992, on the 57 km (35 mi) long section from Cheonan to Daejeon, which was intended for use as test track.

Construction started before the choice of the main technology supplier; thus, alignment design was set out to be compatible with all choices. Of the planned 411 km (255 mi) line, 152.73 km (94.90 mi) would be laid on bridges, and another 138.68 km (86.17 mi) in tunnels. However, plans were changed repeatedly, in particular those for city sections, following disputes with local governments, while construction work suffered from early quality problems. Planned operating speed was also reduced from 350 km/h (217 mph) to the 300 km/h (186 mph) maximum of high-speed trains on the market. Three competitors bid for the supply of the core system, which included the rolling stock, catenary and signalling: consortia led by GEC-Alsthom, today Alstom, one of the builders of France's TGV trains; Siemens, one of the builders of Germany's ICE trains; and Mitsubishi Heavy Industries, one of the builders of Japan's Shinkansen trains. In 1994, the alliance of GEC-Alsthom and its Korean subsidiary Eukorail were chosen as winner.

The technology was almost identical to that found on the high-speed lines of France's TGV system. Track-related design specifications included a design speed of 350 km/h (217 mph) and standard gauge.

Phase 1: Seoul–Daegu segment and conventional line upgrades

Following the 1997 Asian financial crisis, the government decided to realise the Gyeongbu HSR in two phases. In the first phase, two-thirds of the high-speed line between the southwestern suburbs of Seoul and Daegu would be finished by 2004, with trains travelling along the parallel conventional line along the rest of the Seoul–Busan route. The upgrade and electrification of these sections of the Gyeongbu Line was added to the project, and the upgrade and electrification of the Honam Line from Daejeon to Mokpo, providing a second route for KTX services. The budget for the first phase was set at ₩12,737.7 billion, that for the entire project at ₩18,435.8 billion in 1998 prices. While the share of government contributions remained unchanged, the share of foreign loans, domestic bond sales and private capital changed to 24%, 29%, and 2%.

The infrastructure and rolling stock were created in the framework of a technology transfer agreement, which paired up Korean companies with core system supplier Alstom and its European subcontractors for different subsystems. Alstom's part of the project amounted to US$2.1 billion or €1.5 billion.

Well ahead of the opening of the Gyeongbu HSR for regular service, in December 1999, 34.4 km (21.4 mi) of the test section, later extended to 57 km (35 mi), was finished to enable trials with trains. After further design changes, the high-speed tracks were finished over a length of 223.6 km (138.9 mi), with 15.0 km (9.3 mi) of interconnections to the conventional Gyeongbu Line, including at a short interruption at Daejeon. The high-speed section itself included 83.1 km (51.6 mi) of viaducts and 75.6 km (47.0 mi) of tunnels. Conventional line electrification was finished over the 132.8 km (82.5 mi) across Daegu and on to Busan, the 20.7 km (12.9 mi) across Daejeon, and the 264.4 km (164.3 mi) from Daejeon to Mokpo and Gwangju. After 12 years of construction and with a final cost of ₩12,737.7 billion, the initial KTX system with the first phase of the Gyeongbu HSR went into service on April 1, 2004.

Phase 2: Daegu–Busan, extra stations, urban sections

The Daegu–Busan section of the Gyeongbu HSR became a separate project with the July 1998 project revision, with a budget of ₩5,698.1 billion, with funding from the government and private sources by the same ratios as for phase 1. In August 2006, the project was modified to again include the Daejeon and Daegu urban area passages, as well as additional stations along the phase 1 section. For these additions, the budget as well as the government's share of the funding was increased.

Construction started in June 2002. The 128.1 km (79.6 mi) line, which follows a long curve to the northeast of the existing Gyeongbu Line, includes 54 viaducts with a total length of 23.4 km (14.5 mi) and 38 tunnels with a total length of 74.2 km (46.1 mi). The two largest structures are the 20,323 m (66,677 ft) Geomjeung Tunnel, under Mount Geumjeong at the Busan end of the line; and the 13,270 m (43,540 ft) Wonhyo Tunnel, under Mount Cheonseong south-west of Ulsan, which became the longest and second longest tunnels in Korea once the line opened.

A long dispute concerning the environmental impact assessment of the Wonhyo Tunnel, which passes under a wetland area, caused delays for the entire project. The dispute gained nationwide and international attention due to the repeated hunger strikes of a Buddhist nun, led to a suspension of works in 2005, and only ended with a supreme court ruling in June 2006. With the exception of the sections across Daejeon and Daegu, the second phase went into service on November 1, 2010. By that time, ₩4,905.7 billion was spent out of a second phase budget, or ₩17,643.4 billion out of the total.

The two sections across the urban areas of Daejeon and Daegu, altogether 40.9 km (25.4 mi), will be finished by 2014. As of October 2010, the total cost of the second phase was estimated at ₩7,945.4 billion, that for the entire project at ₩20,728.2 billion. The last element of the original project that was shelved in 1998, separate underground tracks across the Seoul metropolitan area, was re-launched in June 2008, when an initial plan with a 28.6 km (17.8 mi) long alignment and two new stations was announced.

Early 2010s service expansion and existing lines upgrade

The electrification and the completion of the re-alignment and double-tracking of the Jeolla Line, which branches from the Honam Line at Iksan and continues to Suncheon and Yeosu, began in December 2003, with the aim to introduce KTX services in time for the Expo 2012 in Yeosu. The upgrade will allow to raise top speed from 120 to 180 km/h (75 to 112 mph). The section of the perpendicular Gyeongjeon Line from Samnangjin, the junction with the Gyeongbu Line near Busan, to Suncheon is upgraded in a similar way, with track doubling, alignment modifications and electrification for 180 km/h (112 mph). The until Masan was opened on December 15, 2010. The upgrade is to be complete until Jinju by 2012 and Suncheon by 2014.

AREX line, which link Seoul to the city's Incheon Airport, also see its speed raised from 110 to 180 km/h (68 to 112 mph) for KTX through-running service to other cities in the nation, however the through running service have been discontinued due to low usage.

The Ulsan–Gyeongju–Pohang section of the Donghae Line is foreseen for an upgrade in a completely new alignment that circumvents downtown Gyeongju and connects to the Gyeongbu High Speed Railway at Singyeongju Station, allowing for direct KTX access to the two cities. On April 23, 2009, the project was approved by the government, and a ground-breaking ceremony was held. The altogether 76.56 km (47.57 mi) line is slated to be opened in December 2014.

2nd national construction plan

On September 1, 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020. The main new element of the plan is to aim for top speeds of 230–250 km/h (143–155 mph) in upgrades of much of the mainline network with view to the introduction of KTX services. The conventional lines under the scope of the plan include the above, already on-going projects, and their extensions along the rest of the southern and eastern coasts of South Korea, lines along the western coast, lines north of Seoul, and the second, more easterly line between Seoul and Busan with some connecting lines.

New high speed lines in the 2010s

Honam HSR

Until 2006, the first plans for a second, separate high-speed line from Seoul to Mokpo were developed into the project of a line branching from the Gyeongbu HSR and constructed in two stages, the Honam High Speed Railway (Honam HSR). The budget for the 185.75 km (115.42 mi) first stage, from the new Osong Station on the Gyongbu HSR to Gwangju·Songjeong Station, was set at ₩8,569.5 billion. The second stage, the 48.74 km (30.29 mi) remaining to Mokpo, was to be finished by 2017 with a budget of ₩2,002.2 billion. The Osong-Iksan section of the first phase is also intended for use as high-speed test track for rolling stock development, to be fitted with special catenary and instrumented track. The ground-breaking ceremony was held on December 4, 2009. As of September 2010, progress was 9.6% of the project budget then estimated at ₩10,490.1 billion for the first phase, which was due for completion in 2014, while the estimate for the entire line stood at ₩12,101.7 billion.

Suseo HSR

First plans for the Honam HSR foresaw a terminus in Suseo station, southeast Seoul. The branch to Suseo was re-launched as a separate project, the Suseo High Speed Railway (Suseo HSR), in June 2008. Detailed design of the 61.1 km (38.0 mi) line is underway since September 2010, with opening planned by the end of 2014. For the longer term, new high-speed lines from Seoul to Sokcho on the eastern coast, and a direct branch from the Gyeongbu HSR south to Jinju and further to the coast are under consideration. In conjunction with the award of the 2018 Winter Olympics to PyeongChang in July 2011, KTX service via the eastern coast line was anticipated; the expected travel time there from Seoul is 50 minutes.

The line is currently served by SRT, not KTX.

Future plans

Jeju Island

In January 2009, the Korea Transport Institute also proposed a 167 km (104 mi) line from Mokpo to Jeju Island, putting Jeju 2 hours 26 minutes from Seoul. The line would include a 28 km (17 mi) bridge from Haenam to Bogil Island and a 73 km (45 mi) undersea tunnel from Bogil Island to Jeju Island (with a drilling station on Chuja Island), for an estimated cost of US$10 billion. As the proposal was popular with lawmakers from South Jeolla Province, the government is conducting a feasibility study, but the Jeju governor expressed skepticism. The Seoul-Jeju route is the world's busiest air route with 13.7 million passengers (2023). However, Jeju Gov. Won Hee-ryong opposed this plan since it would ruin the island's identity and make the Jeju economy more dependent on the mainland.