Finish mainly for interior dividing walls and ceilings

  • 4 min read
  • 3 chapters
Laths seen from the back with plaster visible between them
Asmithmd1 · Public domain

Related on Lably

Through Wall, Wood and Plaster

Lath and plaster largely fell out of favor in the US, Canada and UK by the 1930s to 1950s because of the introduction of drywall (known as plasterboard in the U.K.), which is less time consuming and requires less specialized training to install. However, genuine plaster is more moisture tolerant and often seen as superior for soundproofing.

Description

The wall or ceiling finishing process begins with wood or metal laths. These are narrow strips of wood, extruded metal, or split boards, nailed horizontally across the wall studs or ceiling joists. Each wall frame is covered in lath, tacked at the studs. Wood lath is typically about one inch (2.5 cm) wide by four feet (1.2 m) long by 1⁄4 inch (6 mm) thick. Each horizontal course of lath is spaced about 3⁄8 inch (9.5 mm) away from its neighboring courses. Metal lath is available in 27-inch (69 cm) by 8-foot (240 cm) sheets.

In Canada and the United States the laths were generally sawn, but in the United Kingdom and its colonies, riven or split hardwood laths of random lengths and sizes were often used. Early American examples featured split beam construction, as did examples put up in rural areas of the U.S. and Canada well into the second half of the 19th century. Splitting the timber along its grain greatly improved the laths' strength and durability. As Americans and Canadians expanded west, saw mills were not always available to create neatly planed boards and the first crop of buildings in any new western or northern settlement would be put up with split beam lath. In some areas of the U.K. reed mat was also used as a lath.

Temporary lath guides are then placed vertically to the wall, usually at the studs. Lime or gypsum plaster is then applied, typically using a wooden board as the application tool. The applier drags the board upward over the wall, forcing the plaster into the gaps between the lath and leaving a layer on the front the depth of the temporary guides, typically about 1⁄4 inch (6.4 mm). A helper feeds new plaster onto the board, as the plaster is applied in quantity. When the wall is fully covered, the vertical lath "guides" are removed, and their "slots" are filled in, leaving a fairly uniform undercoat.

In three coat plastering it is standard to apply a second layer in the same fashion, leaving about 1⁄2 inch (13 mm) of rough, sandy plaster (called a brown coat or browning (UK)). A smooth, white finish coat goes on last. After the plaster is completely dry, the walls are ready to be painted. In this article's photo ("lath seen from the back...") the curls of plaster are called keys and are necessary to keep the plaster on the lath. Traditional lime based mortar/plaster often incorporates horsehair or other animal fiber which reinforces the plasterwork, thereby helping to prevent the keys from breaking away.