Lably
Skip to content

London Overground

London suburban rail network

  • 28 min read
  • 10 chapters

Related on Lably

Through Joint venture and London Underground

The Overground forms part of the United Kingdom's National Rail network but it is under the concession control and branding of Transport for London (TfL). Operation has been contracted to First Rail London since May 2026. TfL previously assigned orange as a mode-specific colour for the Overground in branding and publicity including the roundel, on the Tube map, trains and stations. In 2024, each of the six Overground lines were given a distinct colour and name.

Background

Pre-1999

Rail services in Great Britain are mostly run under franchises operated by private train operating companies, marketed together as National Rail.

The concept of developing a network of orbital services around London goes back to the independently produced Ringrail proposals in the early 1970s. Some of these were evaluated in the London Rail Study of 1974 (the Barren Report) and Barren suggested consideration of a North London Network of orbital services, based on a later suggestion by the Ringrail Group, which involved using many existing rail routes, rather than the new construction suggested in earlier drafts of the Ringrail Plan.

The proposal from Barren was for several overlapping services mainly using the North London line, generally at 20-minute intervals. The suggested routes followed the original North London line service from Broad Street to Richmond, new services from Barking to Clapham Junction, and a third service from Ealing Broadway to North Woolwich. Nothing came of these proposals.

In 1979, the Greater London Council (GLC) decided to sponsor an improved service from Camden Road, on the North London line, to North Woolwich, opening up a previously freight-only line between Dalston and Stratford and linking it to an improved Stratford – North Woolwich service. This was given the marketing name Crosstown Linkline, and operated with basic two-car diesel multiple units.

The next initiative came from the GLC in 1984, when the government supported the Broadgate development that would entail the demolition of Broad Street station. The closure process was convoluted because of problems in making alternative arrangements for the North London line, and the remaining services operating from Watford Junction to the City. These eventually ran to and from Liverpool Street via a new section of track, the Graham Road Curve.

British Rail replaced the existing three-car Class 501 electric trains (built 1957) with slightly newer but shorter two-car Class 416 electric trains (built 1959), leading to overcrowding. In 1988, by reorganising and reducing services on the Great Northern routes from Moorgate, about 18 relatively modern Class 313 dual-voltage electric trains were transferred to operate the North London and Watford services, from both Euston and Liverpool Street.

Several voluntary sector groups, the Railway Development Society (RDS, later Railfuture), Transport 2000's then London groups, and the Capital Transport Campaign, launched a series of leaflets and briefings promoting a concept called Outer Circle. This name had once been used for a semi-circular service from Broad Street to Mansion House, which ceased during World War I.

Sign in to keep reading

9 more chapters are free with a Lably account.

More in Transportation