Maamba Coal Power Station
Coal powered thermal power plant in Zambia
- 2 min read
- 4 chapters
Related on Lably
Location
The power station is located in the town of Maamba, in Sinazongwe District, in the Southern Province of Zambia. Maamba is located approximately 342 kilometres (213 mi), southwest of the city of Lusaka, the national capital.
Sign in to keep reading
3 more chapters are free with a Lably account.
Overview
In 2016, Maamba Collieries Limited commercially commissioned the 300 MW Unit I of this power station. This unit comprises two steam generators with capacity of 150 MW each. Coal supplied by Maamba Collieries is used to boil water. This generates steam, which is used to turn turbines which in turn generate electricity. The first unit (Unit I) was set up to mitigate national generation shortage due prevailing severe drought in the country and the continental region.
Due to more severe weather conditions and patterns in Zambia and Southern Africa, the power generation capacity deteriorated further. Maamba Collieries obtained authorization and financing to expand the existing power station by adding Unit II, with capacity of 300 MW as well.
Ownership
The power station is 100 percent owned by Maamba Collieries Limited (MCL), a joint venture company registered in Zambia. The shareholding in MCL is as illustrated in the table below.
- Note 1: ZCCM Investments Holdings Plc. is 100 percent owned by the government of Zambia
- Note 2: Nava Bharat Singapore Limited is a subsidiary of NAVA Limited, an Indian industrial, mining, manufacturing and agribusiness conglomerate.
Construction costs and timetable
The first phase (Unit I) was constructed at an estimated cost of about US$828 million. The financiers for that phase included Barclays Bank, Bank of China, Industrial and Commercial Bank of China, Standard Chartered, Industrial Development Corporation of South Africa and the Development Bank of Southern Africa. Sinosure of China provided project insurance.
As for the second phase, construction is slated to start in August 2024 and conclude in July 2026. The construction costs for Unit II is estimated at US$400 million, because Unit II shares some infrastructure with Unit I. The Zambian National Pension Fund is being considered for partial funding of this phase.