Lably
Skip to content

Mbale–Bulambuli–Siti Medium Voltage Power Line

Medium voltage power line in Uganda

  • 2 min read
  • 4 chapters

Explore on Lably

ToursExplore Lably’s 3D tours

Location

The 33 kilo Volt power line starts at the Umeme Limited (Umeme) 33kV substation at Mbale, Mbale District, in Uganda's Eastern Region. The power line travels in a general north-easterly direction to the town of Bulambuli, in Bulambuli District, a distance of about 56 kilometres (35 mi). From there, the power line takes a general easterly direction to end at Siti II Hydroelectric Power Station, a distance of about 101 kilometres (63 mi), by road from Bulambuli. Due to the steep terrain, the power line does not always follow the winding road. The line measures only 125 kilometres (78 mi), from Mbale to Siti II Power Station.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Energy