Lably
Skip to content

METRORail

Light rail system in Houston, Texas

  • 27 min read
  • 4 chapters

Related on Lably

Through Public–private partnership

History

Predecessors

The first streetcar service was a mule-drawn railcar operated by the Houston City Railroad Company along McKinney Street in 1868. Because the company chose a bad street alignment, the nascent line foundered after just weeks in service. It was succeeded by the Houston City Street Railway (HCSR), which was founded in 1870 and began revenue operation in 1874 with routes following busy merchant districts along Congress Avenue and Main Street, the latter of which ran to one of the first sites of the Texas State Fair; the area was subsequently developed and is now Midtown, Houston. A competing service, the Bayou City Street Railway, was started in 1883 with a single route along Texas Avenue, but it was purchased and folded into HCSR later that year. A new competitor, also named Bayou City Street Railway, was founded in 1889; the new Bayou City was purchased and consolidated into HCSR in 1890 by Oscar Carter, who also announced plans to electrify the system.

By 1892, electrification of the existing streetcar lines was complete and extensions began past the immediate downtown/central Houston area (within a 1+1⁄2 mi (2.4 km) radius of the Harris County Courthouse), including the Houston Heights suburb, which was developed by Carter and required streetcar service due to its distance from central Houston. HCSR was acquired by the Houston Electric Company in 1901, which was managed by Stone & Webster and continued to expand the service, including the start of interurban service to Galveston provided by the affiliated Galveston–Houston Electric Railway in 1911. However, the popularity of privately owned automobiles began to displace demand for streetcar service and the system stopped expanding after 1927. Several streetcar lines were converted to conventional bus lines in 1936, and the right-of-way for the Interurban was sold in 1940, later being reused for the Gulf Freeway. The last streetcar completed its run early in the morning of June 9, 1940, and the rails were later removed and scrapped during World War II.

A 'sample' monorail line was built in Houston in 1955; the Trailblazer operated over a 1,600 ft (490 m) line at Arrowhead Park with a peak speed of 10 mph (16 km/h), starting on February 18, 1956. The monorail ceased operation in September of that year and subsequently was moved to Fair Park in Dallas for the Texas State Fair, where it continued to run until 1964.

False starts

Rapid Transit Lines, the successor to HCSR and Houston Electric, proposed a rapid transit system as a long-range project under the 1971 "Transit Action Program" (TAP), developed by Alan M. Voorhees and Associates, largely laid out along the radial spokes centered in the Inner Loop, tracing the city's major freeways. TAP would be implemented in two stages. In Stage 1, 40 mi (64 km) of rapid transit routes would be built, including fixed rail lines serving the southwest, west, and northeast parts of Houston (with a downtown subway), and three bus-exclusive lanes along the North, Gulf, and South freeways. Stage 1 was planned to complete in the 1970s at an estimated cost of $800 million. Under Stage 2, scheduled for completion before 1990, the Stage 1 rail lines would be extended and two more would be added, bringing the total system to 80 mi (130 km). TAP would have been the technical basis for the proposed Houston Area Rapid Transit Authority (HARTA), but a referendum to form HARTA was "soundly defeated" in 1973. The city of Houston purchased Rapid Transit Lines in April 1974 for $5.3 million and renamed it the Houston Transit System ("HouTran").

Houston formed the Office of Public Transportation in January 1975 to plan the region's public transportation system, and began working on an update of TAP. After METRO was formed in 1978/79, an initial Phase I alternatives analysis identified multiple potential transit corridors, and under Phase II, proposed in 1980, the "Southwest/Westpark" corridor (along what is now the Westpark Tollway) was prioritized for further study. The proposed Southwest/Westpark corridor would have run 13.1 mi (21.1 km), generally parallel to the Southwest Freeway, with equal lengths west and east of the West Inner Loop. The planned route would run from downtown Houston along Main Street to approximately Elgin, and west from Elgin to West Belt along existing public and rail rights-of-way. Service options that could be operated along the corridor included a dedicated busway on an elevated structure (carrying 203,500 daily riders at an estimated capital construction cost of $878 million), an elevated light rail system (213,400 daily passengers; $1.297 billion), a light rail subway (226,800 daily; $1.572 billion), or a grade-separated heavy rail system with subway through the central business district (223,700 daily, $1.366 billion). At the time, it was estimated that 9.5 million person-trips were made per day in Harris County; of those, 98.7% were taken using private vehicles.

METRO updated its 1980 Southwest/Westpark corridor proposal and extended the eastern terminus north by 5.1 mi (8.2 km), combining it with the proposed North corridor as the "Houston Rail Rapid Transit Project"; the extended line now ran north past I-10 and the North Inner Loop to Crosstimbers. The design called for 11.5 mi (18.5 km) of elevated tracks, 1.9 mi (3.1 km) of subway, and 4.8 mi (7.7 km) at-grade. The system would have 17 passenger stations (eight aerial, six at-grade, and three subway), and included a new railyard/maintenance facility at Cavalcade. The 1983 proposal was rejected by Houston voters via referendum. Light voter turnout was blamed for the defeat of the $2.35 billion proposal, which included the purchase of approximately 400 new buses and construction of a 18.5 mi (29.8 km) heavy rail system. The capital cost of the rail system alone was estimated at $1.436 billion, including 130 new rail vehicles.

In the wake of the 1983 defeat, METRO began work on a regional transit plan, integrating inputs from city, county, and state governments and developing three options for implementation: A (bus routes only), B (light rail loop and radial bus routes), or C (light rail with supplemental bus routes); after approximately 250 meetings were held in 1984 and 1985, citizens overwhelmingly supported Option C, with planned light rail service to operate along Main Street within the inner loop (I-610). Longtime Houston Mayor Kathryn Whitmire appointed Bob Lanier to chair METRO in 1988; Lanier shepherded a voter referendum that year which passed, approving the Phase 2 Regional Mobility Plan which included 20-mile (32 km) of fixed guideway transit. Under the 1988 referendum, METRO would devote 1⁄4 of its sales tax revenue on roads, 1⁄2 on improving bus service, and the remaining 1⁄4 on developing the fixed guideway plans, but Lanier showed reluctance to follow through on developing plans for a fixed guideway, questioning the projected ridership numbers, and Whitmire fired him in late December 1989. Incensed, Lanier released a memorandum attacking the mayor's rail transit plans, and Whitmire responded by holding a press conference on Lanier's front lawn during his annual Christmas party.

Houston was the largest city in the United States without a rail system after the 1990 opening of the now A Line in Los Angeles. After issuing an RFP in July 1990, METRO received five proposals for the design and development of the fixed guideway system. In March 1991, METRO approved a plan to develop a monorail system similar to the one operating at Walt Disney World in Orlando at an estimated cost of $1.27 billion, operating along the extended Southwest/Westpark corridor between the Houston Galleria and downtown Houston. The proposed monorail system would operate with an initial 14 mi (23 km) segment servicing western residential regions west of downtown to Beltway 8 (Sam Houston Tollway), with construction planned to start in 1993 and revenue service to begin by 1998. Future planned expansions included one leg that would connect downtown with the Texas Medical Center and Astrodome to the south, and another leg connecting downtown to Texas Southern University and the University of Houston. In 1991, U.S. Rep. Tom DeLay removed $65 million in federal funding for the rail line and after Lanier was elected mayor of Houston in 1992, defeating Whitmire, the plan was stopped. Lanier's election was seen as a second referendum on the monorail plan; the funding was diverted to road projects and police patrols instead.

Main Street Line

After these setbacks, Houston drew up a rail plan without federal subsidies and published it in 1997 as the Houston METRO 2020 Regional Transit Plan. The Houston city council approved the light rail project in November 2000 and set a January 25, 2001 date for a groundbreaking ceremony, but councilmember Rob Todd filed a lawsuit opposing construction, claiming the METRO organization was a "private business" and subject to Houston City Charter provisions requiring a public vote on business use of its streets; the ceremony was cancelled following a temporary restraining order, issued by Judge Tony Lindsay on January 18. Todd was joined as co-plaintiff by Allan Vogel, one of 1,100 residents who signed a petition seeking a public vote on the light rail plan. Judge Lindsay later recused herself from the case due to her personal ties to Todd and her husband's public opposition to METRO. She was succeeded by District Judge John P. Devine, who issued an injunction on February 2, halting work on the light rail project and holding up contract awards. A second lawsuit was filed by four property owners.

The injunction issued by Judge Devine in Todd's lawsuit was reversed on appeal on March 9, 2001. Ground was broken on the original 7.5-mile long (12.1 km), 16-station portion of the Main Street (now Red) Line on March 13, 2001. The Texas Supreme Court upheld the appellate court ruling on June 28. That November, voters approved Proposition 1, which allowed the light rail project to continue, but required public referendums for future extensions, and rejected Proposition 3, which would have initiated a public referendum on continuing the initial project.

The initial segment runs between UH–Downtown (northern terminus) and Fannin South (southern terminus). The opening of METRORail, which took place on January 1, 2004, came 64 years after the previous streetcar system had been shut down. At the time, two extensions to the north and east were already in planning, and a concept was advanced for a third extension west.

The cost of the initial segment was $324 million. Tom DeLay strongly opposed construction of the METRORail line and twice blocked federal funding for the system in the United States House of Representatives. Thus the Metrorail was built without any federal funding until November 2011 when a $900 million grant was approved for expansions, under an executive order issued by President Barack Obama.

In spite of the opposition of some groups to the Metrorail, surveys conducted by Stephen Klineberg and Rice University have shown consistent increases in support of rail transport and decreases in support for bigger and better roads/highways in the Houston metropolitan area in recent years. Klineberg considers these changes a "paradigm shift" or "sea change" on attitudes towards mass transit.

Phase II

METRORail Phase II was included as part of the METRO Solutions Transit System Plan (aka Metro Solutions Plan or 2025 Regional Transit Plan) that was placed before voters on the November 4, 2003 ballot. Phase II included six proposed light rail segments to complement and extend the Main Street line, then under construction.

Voters approved the $1.23 billion Phase II expansion of the as-yet unopened system, including four new lines. Critics of the system opposed METRO for spending public funds for "educational advertisements" about the proposed system, which critics claimed promote the referendum. Critics further claimed that the main political action committee (PAC) supporting the bond had a conflict of interest because it received over US$100,000 in contributions from contractors and equipment suppliers for METRORail who stood to gain financially from its expansion. By 2004, Rep. DeLay was hailing the leadership team at METRO for both its "vision for a mobile Houston region, and the kind of open minds and flexible management style it will take to realize that vision", adding that "[METRO] are holding a forum to look at all forms of technology and how those technologies fit into the mobility in Houston"; at least one observer noted that DeLay was advocating for "innovative rail solutions", not light rail.

In 2004, an alternatives analysis selected a shorter route for the Southeast Corridor.

The North and Southeast corridors received their records of decision from the Federal Transit Administration (FTA) in July 2008. Construction began in July 2009 on the 5.3-mile-long (8.5 km) North/Red Line Extension (North Corridor), including nine stations from UH–Downtown to the Northline Transit Center/HCC. The 6.6-mile (10.6 km) Purple Line (Southeast Corridor), with ten stations, and the 3.3-mile (5.3 km) Green Line, with nine stations, also began construction in July 2009. According to the project schedules, the Red Line Extension would enter revenue service by 2013 and the Green Line by 2014. However, METRO announced on September 9, 2010, that the opening dates for the Red Line Extension, Purple and Green lines had been pushed back to 2014 and by September 2014, the start date had slipped back to April 4, 2015.

In November 2009, METRO applied for a $900 million grant from the Federal Transit Administration to fund future construction. Allegations were made that METRO lied about the income from their sales tax revenue to allow them to gain $900 million in federal funds for all five planned rail expansions. However, city officials found no such attempt by METRO to mislead them, but the Federal Transit Administration (FTA) continued to withhold its approval for the money until further figures can be examined. On December 8, 2011, the FTA finally announced the award. The award of $900 million was broken into two $450 million grants from the New Starts transit program, to fund construction of the Red Line Extension and Purple lines. METRO offered the public a chance to name stations on its expansion lines.

Part of the funding allocated by the FTA under its New Starts program for the North, Southeast, and University Corridor projects included up to US$205 million to expand the LRV fleet to 104 vehicles and replace the existing 19 LRVs on the Red Line. METRO selected a public-private partnership model for the North and Southeast corridors, where the contracted firm would be responsible for vehicle procurement and operation and maintenance of those lines, and entered a contract with Washington Group International (WGI); METRO/WGI issued a request for proposals for 103 firm new vehicles and an option of up to 75 additional vehicles on August 31, 2007. Although the FTA reminded METRO about federal procurement rules on multiple occasions, METRO told prospective bidders that Buy America rules did not apply (presumably because the RFP was issued by the private contractor) and awarded a contract to CAF on March 4, 2009. Later that month, METRO requested a Buy America waiver for two pilot vehicles which would be assembled by CAF in Spain; the FTA denied the waiver request, stating that CAF had signed a certificate of compliance with Buy America requirements. METRO proceeded to use local funds to pursue the pilot vehicle procurement, and the FTA opened an investigation in April 2010. Ultimately, the CAF contract was canceled and 1⁄3 of the US$42 million contract was refunded to METRO.

The North/Red Line extension opened on December 21, 2013 (ahead of its projected early 2014 opening), increasing the line to its current total of 12.8 miles (20.6 km) and 24 stations. Central Station was added to the Red Line to provide transfers to/from the Purple and Green lines.

After numerous delays, all but two stations on the eastern end of the Green Line opened on May 23, 2015, while Cesar Chavez/67th Street and Magnolia Park entered service on January 11, 2017, after the construction of an overpass. Both the Purple and Green lines, together costing $1.3 billion, share a track segment in downtown, then run east and diverge.

Cancellations and BRT conversions

Plans for the Inner Katy rail line (east of Loop 610) under the METRO Solutions Plan (2003) conflicted with existing plans to widen the Katy Freeway west of Loop 610 to Texas State Highway 6. A Major Investment Study for the Katy Freeway Expansion was started in 1994 and approved in October 1997; the draft and final environmental impact statements were completed by August 30, 2002. In preparation, TxDOT purchased a portion of the right-of-way for the old Katy Railroad from Union Pacific (UP) in 1992 for $78 million, and the UP was scheduled to begin track removal in the last half of 1997. In all, 28 mi (45 km) of track were removed from Katy/Fort Bend Road in Brookshire to Canal Street in Houston. The adopted alternative for the expanded freeway called for an at-grade roadway with a total right-of-way width of 475 ft (145 m); in each direction, there would be two managed lanes closest to the center, flanked by four main lanes, up to two auxiliary lanes, and three frontage road lanes. That year, a Memorandum of Understanding was signed between TxDOT, METRO, and Harris County, which identified requirements for the managed lanes, including prioritization of METRO buses and an option to convert those lanes to light rail transit in the future. The Gulf Coast Institute criticized the contradictions between TxDOT, which selected the managed lanes over rail due to insufficient projected transit demand, and METRO's Solutions Plan, which noted that a Katy line could "offer the potential for sizeable transit volume". By 2005, the Inner Katy corridor had been dropped from METRO Solutions.

METRO began negotiations with Southern Pacific (SP) to acquire the tracks and right-of-way alongside the Eastex Freeway that were formerly owned by the San Antonio and Aransas Pass Railroad and a conceptual agreement was reached in December 1992; METRO would re-use the line for commuter rail service. However, after METRO decided to purchase a subset of the original agreement at a fraction of the agreed-upon price, SP sued and the a settlement was reached in 1997, with METRO purchasing 58 mi (93 km) for $72 million. Shortly after the purchase was completed, business interests pressured METRO into selling a portion of the right-of-way to the Harris County Toll Road Authority, which was eventually developed into the Westpark Tollway. By 2006, a proposed revised corridor along Richmond was drawing opposition from local business owners and Texas Rep. Martha Wong, who advocated for a route along Westpark instead. In August 2010, a budget shortfall of $49 million was announced by METRO, which halted progress on the University Line. The line had received a final Federal Record of Decision letter from the FTA in July but METRO had not announced a construction schedule or funding plan. Since then, BRT service has been proposed along the corridor instead.

METRO published the "Uptown-West Loop Planning Study" in 2004, which was a proposed light rail line along Post Oak Boulevard and West Inner Loop, connecting new stations at Bellaire (at the junction with U.S. Route 59) and Northwest Transit Center (at the junction with I-10). In the alternatives analysis, bus rapid transit (BRT) service was considered and dismissed as an alternative to light rail, due to the reduced capacity of BRT vehicles and the strong community preference for rail. Due to lack of funds, it was announced in early 2013 that the Uptown Line (now Silver Line) will be constructed initially as a bus rapid transit (BRT) line. The design will feature the ability to easily convert the line to light rail in the future. This will allow the line to be functional as early as 2017.

Following METRO's 2010 annual audit, the agency decided to cancel the Burnett Plaza project. $41 million was spent on the initial design of the proposed intermodal terminal. This was part of a $168 million asset liquidation. The price of the land $21 million is valued separately. $61 million of the liquidation was listed as "unrealized assets", including charges for redundant design contractors and changes.

Future plans

METRO put the METRONext Moving Forward Plan before Houston area voters in November 2019; voters approved the $3.5 billion bond by a margin of nearly two-to-one. Bonds issued will be used to extend existing light rail service. The Red Line will be expanded North to the North Shepherd park & ride, and both the Green and Purple lines will be expanded east and south to William P Hobby Airport, and west to the Houston Municipal Courthouse.

A long extension or possible commuter rail line from Fannin South to Sugar Land and beyond has been studied since 2004. The route would parallel U.S. 90A in the existing right-of-way used by the Glidden subdivision owned by UP. In 2011, the Southwest Rail Corridor was proposed to connect Fannin South and Missouri City. This was not constructed, but the METRONext plan includes a similar route extended to Sugar Land which it describes as a "future METRORail potential partnership."

METRO soon cancelled major expansion plans in 2024.

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Transportation