The 132 kilo Volt power line starts at the Uganda Electricity Transmission Company Limited (UETCL) 132kV substation at Mirama Hills, in Ntungamo District, at the international border with Rwanda. From there it travels westwards to the town of Rushenyi, Ntungamo District, a road distance of approximately 47 kilometres (29 mi).

From Rushenyi, the power line takes a general southwesterly direction and travels to Kabale, in Kabale District, a distance of approximately 47.2 kilometres (29 mi), from Rushenyi. The power line does not follow the road all the time as is slightly shorter, measuring a total of 85 kilometres (53 mi).