Msenge Emoyeni Wind Power Station
Wind farm in South Africa
- 1 min read
- 4 chapters
Related on Lably
Through Wind power
Location
The power station is located outside of the town of Bedford, in Raymond Mhlaba Municipality, Amathole District, Eastern Cape. Bedford is located approximately 200 kilometres (124 mi) north of Gqeberha, the nearest large city.
Sign in to keep reading
3 more chapters are free with a Lably account.
Overview
The power station was built, funded and is operated by a consortium referred to as the ACED-IDEAS-Reatile Consortium. This wind farm comprises 16 wind towers, each supporting a 4.5 megawatts generator, manufactured by Goldwind Science and Technology. The generation capacity of the power station is 72 MW, however the contracted supply capacity is 69 MW.
Developers
The table below illustrates the ownership of ACED-IDEAS-Reatile Consortium.
Construction and timeframe
The Cape Town-based civil engineering company, Rumdel Construction (Cape) Limited handled the engineering, procurement and construction contract for this wind farm. Construction began in Q2 2023 and concluded in October 2024. Rand Merchant Bank was the lead arranger of the construction loan package.