Mumbai–Nagpur high-speed rail corridor

Proposed Bullet Train Project in Maharashtra, India

  • 1 min read
  • 3 chapters

Related on Lably

Through Nashik

The route is set to be 742 km (461 mi) in length, running entirely within the state of Maharashtra. 68% route will run along the Mumbai–Nagpur Expressway. The cost of the project is expected to ₹1.7 lakh crore (US$18 billion).

Project status

2021

  • March: Aerial LiDar survey begins.

2022

  • February: DPR Submitted to Railway Board.

2023

  • September: The railway board submitted the detailed project report to the Railway Ministry for approval. 68% of the bullet train line will be along Samruddhi highway.