Mumbai–Pune Expressway

Expressway in Maharashtra, India

  • 9 min read
  • 8 chapters

Related on Lably

Through Lane, India and Pune

The expressway starts at Kalamboli in Raigad District's Navi Mumbai and ends at Kiwale in Pune. It cleaves through the scenic Sahyadri mountain ranges through passes and tunnels. It has five interchanges: Kon (Shedung), Chowk, Khalapur, Kusgaon and Talegaon. The expressway has two carriageways, each with three concrete lanes, separated by a central divider and a tarmac or concrete shoulder on either side. Pedestrians, pedal bicycles, two-wheelers, three-wheelers, bullock carts and tractors are not permitted, although tractor-trailers (semi-trailer rigs) are permitted. Vehicles are also prohibited from halting on the expressway. The expressway handles about 43,000 PCUs daily, and is designed to handle up to 1,00,000 PCUs.

The expressway has reduced the travel time from Kalamboli in Raigad, near Mumbai to Kiwale in Pune to about two hours. It has largely supplemented the Mumbai-Pune section of NH 48, which had become extremely congested and accident-prone.

The expressway is not part of NHAI highway network NH 48 and has been built, operated and maintained wholly by the Government of Maharashtra via Maharashtra State Road Development Corporation. NH 48 is another separate older national highway. The NH 48 merges with this expressway for a short distance near Khandala. Due to the winding route taken as the road climbs up the hills, traffic congestion occurs on that part of the expressway where NH 48 merges. To alleviate this, a 'missing link' (bypass) was constructed and opened in May 2026. This allows traffic to bypass the hill (ghat) section, reducing the distance by about 6 km (3.7 mi) and travel time by an estimated 25 minutes.

History

The government of Maharashtra appointed RITES in 1990 to carry out feasibility studies for the new expressway to be operated on toll basis. RITES submitted its report in 1994 with the estimated cost of the project at ₹11.46 billion (US$120 million).

The government of Maharashtra entrusted the work of the construction of the expressway to MSRDC in March 1997 on Build-Operate-Transfer basis with permission to collect toll for 30 years. The Ministry of Environment and Forests, Government of India gave environmental clearance on 13 October 1997 and forest clearance on 11 November 1997.

The tender notice was published in leading newspapers all over India and also on the Internet. Due to the wide publicity, 133 tenders were sold and 55 tenders were received on 18 December 1997. After technical and financial evaluation, work orders were given on 1 January 1998 to four contractors. Thereafter tenders for widening of Khandala and Lonavala-Khandala bypass works were invited. The tenders were received on 24 August 1998 and orders were issued on 4 September 1998.

This six-lane project was completed under the stewardship of the Maharashtra State Road Development Corporation (MSRDC). The expressway cost ₹16.3 billion (US$170 million) to construct. The first sections opened in 2000, and the entire route was completed, opened to traffic and made fully operational from April 2002.

The expressway was closed for over 24 hours on 26 July 2005, due to heavy monsoon, which caused several landslides. It was not until 2009, however, that speed limits were posted, at 80 km/h (50 mph), after several accidents due to over-speeding were reported.

In June and July 2015, the expressway faced temporary closure for certain times of the day due to landslides caused by heavy rains, which also caused fatalities. As a precautionary measure, the PWD began to remove loose rocks and installed safety nets, while diverting traffic the old National Highway 48.

As the expressway began to suffer from congestions with time, most notably in the incline section near Khandala and Lonavala due to the movement of heavy vehicles, a proposal to construct an alternative road was approved. The construction began in March 2019, which included 2 new tunnels (23 meter wide, and longest tunnel of 8.87 km), and 2 viaducts, one of them cable stayed, and will pass below the lake in Lonavala. During the period, the other sections of the expressway were progressively expanded to 4 lanes from 3 on each side. Originally stated to complete in March 2024, the deadline has been extended to August 2025, and subsequently extended to 2026. The missing link opened on 1 May 2026, coinciding with the Maharashtra Day.

The expressway faced a limited use of vehicles plying in the lockdown during COVID-19, with only emergency and special passes being allowed. During that period, the MSRDC with the help of Maharashtra Police Highway Traffic department, demolished a section of the 190-year-old Amrutanjan Bridge, a popular out of use railway bridge on the Bhor Ghat while preserving the plaque, as it caused a bottleneck for wide trucks and a potential safety hazard. Following the demolition, safety at that section has been greatly improved.

The expressway was closed on the morning of 6 July 2026 at the Missing Link section due to landslides and damage at the cable stayed bridge caused by heavy rains. According the authorities, the carriageway towards Mumbai on the Missing Link was shut down at 4 AM for a few hours to clear the debris and traffic was rerouted towards Lonavala ghat section and old National Highway 48.