In 2007, when the plant came on line, it was the second solar thermal energy (STE) power plant built in the United States in more than 16 years, and in 2007, the largest STE plant built in the world since 1991. It is located in Eldorado Valley in the southwest fringe of Boulder City, Nevada, and was built in that city's Energy Resource Zone, which requires renewable generation as part of plant development permits; Nevada Solar One was approved as part of Duke Energy's larger El Dorado Energy project, which built 1 GW of electrical generation capacity. The solar trough generation was built by Acciona Solar Power, a partially owned subsidiary of Spanish conglomerate Acciona Energy. Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Acciona purchased a 55 percent stake in Solargenix (formerly Duke Solar), and Acciona owns 95 percent of the project. Nevada Solar One is unrelated to the Solar One power plant in California.

History

In 2006, located 30 miles (48 km) north of Tucson, Arizona Public Service's Saguaro Solar Facility opened, with 1 MW of electrical generation capacity. Nevada Solar One went online for commercial use on June 27, 2007. It uses similar technology and was constructed over a period of 16 months. The total project site is approximately 400 acres (1.6 km2; 0.63 mi2), while the solar collectors cover 300 acres (1.2 km2).

Sign in to keep reading

3 more chapters are free with a Lably account.

More in Environment